Jobs › Companies › Cumming Group › Senior Electrical/Commissioning Project Manager - Data Center Construction

À propos de ce poste Senior Electrical/Commissioning Project Manager - Data Center Construction chez Cumming Group

Cumming Group · Sur site · Dallas, TX

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



We are seeking an experienced Senior Electrical / Commissioning Project Manager to lead the delivery and commissioning of large-scale data center and mission-critical electrical infrastructure projects in Dallas, TX. This role will oversee all phases of electrical project execution and commissioning, from design review and procurement through startup, integrated systems testing (IST), and final turnover. The ideal candidate will ensure critical electrical systems are delivered safely, on schedule, within budget, and meet the highest standards of reliability and operational performance.

Key Responsibilities
  • Lead the delivery and commissioning activities from design through construction, testing, and turnover.
  • Serve as the primary client point of contact, managing project scope, schedule, budget, risk mitigation, and stakeholder communications.
  • Coordinate owners, engineers, contractors, vendors, utility providers, and testing firms to ensure successful project delivery.
  • Review electrical design packages, equipment submittals, one-line diagrams, protection studies, and commissioning requirements.
  • Develop and manage commissioning plans, startup procedures, functional performance tests, integrated systems testing (IST), deficiency logs, and final commissioning documentation.
  • Oversee installation, startup, commissioning, and testing of switchgear, transformers, generators, UPS systems, ATS equipment, substations, grounding systems, EPMS/BMS controls, and power distribution infrastructure.
  • Verify equipment performance, operational readiness, and compliance with project requirements, industry standards, and safety protocols.
  • Manage contractor performance, procurement activities, contract administration, change management, and project reporting.
  • Lead project meetings, resolve technical issues, and provide leadership throughout all phases of the project lifecycle.
  • Travel as required to support projects across the United States.
Qualifications
  • Bachelor's degree in Electrical Engineering, Construction Management, Engineering Technology, or a related field preferred.
  • 8+ years of experience in electrical project management, commissioning, mission-critical facilities, data centers, or electrical construction.
  • Strong understanding of medium- and low-voltage electrical systems, emergency power generation, substations, switchgear, UPS systems, and critical facility operations.
  • Experience leading startup, commissioning, integrated systems testing (IST), and turnover for large-scale data center or mission-critical projects.
  • Knowledge of NFPA, IEEE, NETA, ASHRAE, and industry commissioning best practices.
  • Proven ability to manage complex projects, multi-million-dollar budgets, schedules, and cross-functional teams.
  • Excellent leadership, client-facing communication, negotiation, and technical documentation skills.

#LI-VM1




Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
Prêt à postuler chez Cumming Group ?
Postuler chez Cumming Group

Comment se compare ce salaire pour Project Manager

Ce poste paie $138,833/yr — dans la fourchette habituelle pour les postes Project Manager.

$102,268 la médiane $130,065 $190,690

Fourchette typique $109,988–$154,500/yr, à partir de 38 annonces Project Manager comparables sur JobsRadar (rémunération annualisée en USD). Voir les aperçus de salaire pour Project Manager →

À propos de Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Voir tous les emplois chez Cumming Group →

Emplois similaires

SE
HV Assistant Project Manager (Texas)
SOLV Energy
⚡ Postuler tôt Remote - TX · lieu restreint $97,767–$122,209
● Nouveau 👁 Vu ✓ Postulé il y a 51 min
CoreWeave
Manager, DC Construction - Project Accounting
CoreWeave
⚡ Postuler tôt Dallas, TX Sur site $115,000–$153,000
● Nouveau 👁 Vu ✓ Postulé il y a 19 h
Clune Construction
Senior Project Manager - Tenant Improvement
Clune Construction
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Clune Construction
Project Manager - Tenant Improvement
Clune Construction
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Barry-Wehmiller
Project Manager II
Barry-Wehmiller
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
ST
CS Sr Project Support Manager
Stevens Transport
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
JLL
Construction Senior Project Manager
JLL
⚡ Postuler tôt Phoenix, AZ Hybride
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
PerkinElmer
Senior/Manager, Automation Engineering (cGMP) - Project Farma
PerkinElmer
⚡ Postuler tôt Customer Site - NC Sur site $100,000–$199,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
GA
Senior Project Manager, Mechanical
Galaxy
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Cumming Group

Voir tous les emplois chez Cumming Group →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit