Jobs › Companies › Cumming Group › Senior Electrical/Commissioning Project Manager - Data Center Construction

Sobre este puesto de Senior Electrical/Commissioning Project Manager - Data Center Construction en Cumming Group

Cumming Group · Presencial · Dallas, TX

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



We are seeking an experienced Senior Electrical / Commissioning Project Manager to lead the delivery and commissioning of large-scale data center and mission-critical electrical infrastructure projects in Dallas, TX. This role will oversee all phases of electrical project execution and commissioning, from design review and procurement through startup, integrated systems testing (IST), and final turnover. The ideal candidate will ensure critical electrical systems are delivered safely, on schedule, within budget, and meet the highest standards of reliability and operational performance.

Key Responsibilities
  • Lead the delivery and commissioning activities from design through construction, testing, and turnover.
  • Serve as the primary client point of contact, managing project scope, schedule, budget, risk mitigation, and stakeholder communications.
  • Coordinate owners, engineers, contractors, vendors, utility providers, and testing firms to ensure successful project delivery.
  • Review electrical design packages, equipment submittals, one-line diagrams, protection studies, and commissioning requirements.
  • Develop and manage commissioning plans, startup procedures, functional performance tests, integrated systems testing (IST), deficiency logs, and final commissioning documentation.
  • Oversee installation, startup, commissioning, and testing of switchgear, transformers, generators, UPS systems, ATS equipment, substations, grounding systems, EPMS/BMS controls, and power distribution infrastructure.
  • Verify equipment performance, operational readiness, and compliance with project requirements, industry standards, and safety protocols.
  • Manage contractor performance, procurement activities, contract administration, change management, and project reporting.
  • Lead project meetings, resolve technical issues, and provide leadership throughout all phases of the project lifecycle.
  • Travel as required to support projects across the United States.
Qualifications
  • Bachelor's degree in Electrical Engineering, Construction Management, Engineering Technology, or a related field preferred.
  • 8+ years of experience in electrical project management, commissioning, mission-critical facilities, data centers, or electrical construction.
  • Strong understanding of medium- and low-voltage electrical systems, emergency power generation, substations, switchgear, UPS systems, and critical facility operations.
  • Experience leading startup, commissioning, integrated systems testing (IST), and turnover for large-scale data center or mission-critical projects.
  • Knowledge of NFPA, IEEE, NETA, ASHRAE, and industry commissioning best practices.
  • Proven ability to manage complex projects, multi-million-dollar budgets, schedules, and cross-functional teams.
  • Excellent leadership, client-facing communication, negotiation, and technical documentation skills.

#LI-VM1




Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
¿Listo para postularte en Cumming Group?
Postúlate en Cumming Group

Cómo se compara este salario de Project Manager

Este puesto paga $138,833/yr — en línea con el rango típico para los puestos de Project Manager.

$100,652 la mediana de $130,000 $190,690

Rango típico $107,500–$154,500/yr, a partir de 38 ofertas comparables de Project Manager en JobsRadar (salario anualizado en USD). Ver datos salariales de Project Manager →

Sobre Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Ver todos los empleos en Cumming Group →

Empleos similares

Barry-Wehmiller
Project Manager II
Barry-Wehmiller
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 17h
ST
CS Sr Project Support Manager
Stevens Transport
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 18h
GA
Senior Project Manager, Mechanical
Galaxy
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1d
LO
Project Manager - Mechanical
Loenbro
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1d
LO
Project Controls Manager - Dallas North TX
Loenbro
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1d
LO
Project Controls Manager
Loenbro
⚡ Postúlate pronto Dallas, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1d
Aggreko
Project Manager, Major Projects
Aggreko
⚡ Postúlate pronto Pearland, TX Presencial $130,000–$150,000
● Nuevo 👁 Visto ✓ Postulado hace 2d
Ferrovial
Ferrovial Webber Energy - Project Manager
Ferrovial
⚡ Postúlate pronto Houston, TX Presencial
● Nuevo 👁 Visto ✓ Postulado hace 2d
JLL
Project Manager, Data Centers
JLL
⚡ Postúlate pronto Dulles, VA Presencial
● Nuevo 👁 Visto ✓ Postulado hace 2d

Regístrate para recibir sugerencias adaptadas a los empleos que abres y las búsquedas que guardas.

Más empleos en Cumming Group

Ver todos los empleos en Cumming Group →

Postúlate ahora
🤖

Un momento — para

JobsRadar se creó para personas reales que están pasando un mal momento en su búsqueda de empleo — no para solicitudes automatizadas. Estás haciendo clic demasiado rápido y ahora estás bloqueado temporalmente.

Vuelve más tarde. Si de verdad estás buscando empleo, cuentas con nosotros — solo compórtate como una persona.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Toma ventaja en tu búsqueda de empleo.

Únete a nuestro canal de Telegram para lo que te ayuda a conseguir el puesto — referencias salariales, el pulso semanal del mercado y avisos de nuevas funciones. Sin spam, solo señal.

Únete al canal — es gratis