Jobs › Companies › Cumming Group › Senior Electrical/Commissioning Project Manager - Data Center Construction

Über diese Senior Electrical/Commissioning Project Manager - Data Center Construction Stelle bei Cumming Group

Cumming Group · Vor Ort · Dallas, TX

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



We are seeking an experienced Senior Electrical / Commissioning Project Manager to lead the delivery and commissioning of large-scale data center and mission-critical electrical infrastructure projects in Dallas, TX. This role will oversee all phases of electrical project execution and commissioning, from design review and procurement through startup, integrated systems testing (IST), and final turnover. The ideal candidate will ensure critical electrical systems are delivered safely, on schedule, within budget, and meet the highest standards of reliability and operational performance.

Key Responsibilities
  • Lead the delivery and commissioning activities from design through construction, testing, and turnover.
  • Serve as the primary client point of contact, managing project scope, schedule, budget, risk mitigation, and stakeholder communications.
  • Coordinate owners, engineers, contractors, vendors, utility providers, and testing firms to ensure successful project delivery.
  • Review electrical design packages, equipment submittals, one-line diagrams, protection studies, and commissioning requirements.
  • Develop and manage commissioning plans, startup procedures, functional performance tests, integrated systems testing (IST), deficiency logs, and final commissioning documentation.
  • Oversee installation, startup, commissioning, and testing of switchgear, transformers, generators, UPS systems, ATS equipment, substations, grounding systems, EPMS/BMS controls, and power distribution infrastructure.
  • Verify equipment performance, operational readiness, and compliance with project requirements, industry standards, and safety protocols.
  • Manage contractor performance, procurement activities, contract administration, change management, and project reporting.
  • Lead project meetings, resolve technical issues, and provide leadership throughout all phases of the project lifecycle.
  • Travel as required to support projects across the United States.
Qualifications
  • Bachelor's degree in Electrical Engineering, Construction Management, Engineering Technology, or a related field preferred.
  • 8+ years of experience in electrical project management, commissioning, mission-critical facilities, data centers, or electrical construction.
  • Strong understanding of medium- and low-voltage electrical systems, emergency power generation, substations, switchgear, UPS systems, and critical facility operations.
  • Experience leading startup, commissioning, integrated systems testing (IST), and turnover for large-scale data center or mission-critical projects.
  • Knowledge of NFPA, IEEE, NETA, ASHRAE, and industry commissioning best practices.
  • Proven ability to manage complex projects, multi-million-dollar budgets, schedules, and cross-functional teams.
  • Excellent leadership, client-facing communication, negotiation, and technical documentation skills.

#LI-VM1




Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
Bereit, sich bei Cumming Group zu bewerben?
Bei Cumming Group bewerben

Wie sich dieses Gehalt für Project Manager vergleicht

Diese Stelle zahlt $138,833/yr — im Einklang mit der üblichen Spanne für Project Manager Stellen.

$101,920 dem Median $130,000 $197,925

Übliche Spanne $107,500–$154,500/yr, aus 42 vergleichbaren Project Manager Anzeigen auf JobsRadar (Vergütung auf USD hochgerechnet). Gehaltseinblicke für Project Manager ansehen →

Über Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Alle Jobs bei Cumming Group ansehen →

Ähnliche Jobs

LP
Senior Project Manager - Data Center
Lincoln Property Company through LinkedIn
⚡ Früh bewerben Dallas, TX Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 21 Std.
Lincoln Property Company
Senior Project Manager
Lincoln Property Company
⚡ Früh bewerben Dallas, TX Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 21 Std.
MC
Project Manager - Mission Critical/ Data Center - Michels Underground Cable, Inc
Michels Corporation
⚡ Früh bewerben Austin, TX; Dallas, TX  ; Hous... Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
MC
Associate Construction Project Manager - Data Center Substation - Michels Power, Inc.
Michels Corporation
⚡ Früh bewerben Dallas, TX   Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
MC
Electrical Project Manager - Michels Power, Inc.
Michels Corporation
⚡ Früh bewerben Dallas, TX   Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Accenture
Project Manager/Scrum Master - 6556710
Accenture
⚡ Früh bewerben TX - Dallas Vor Ort $91,520–$112,320
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Atwell, LLC
Associate Project Manager - Land Development
Atwell, LLC
⚡ Früh bewerben Dallas, Texas, United States Vor Ort $90,000–$125,000
● Neu 👁 Gesehen ✓ Beworben vor 3 Tg.
Atwell, LLC
Project Manager - Land Development
Atwell, LLC
⚡ Früh bewerben Dallas, Texas, United States Vor Ort $95,000–$140,000
● Neu 👁 Gesehen ✓ Beworben vor 3 Tg.
Woolpert
Client Development & Project Delivery Manager
Woolpert
⚡ Früh bewerben Austin, TX; Dallas, TX; Housto... Vor Ort $165,000–$247,400
● Neu 👁 Gesehen ✓ Beworben vor 3 Tg.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei Cumming Group

Alle Jobs bei Cumming Group ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos