Jobs › Companies › Serverfarm › Data Center Construction - Project Manager (Relocation Assistance Available)

À propos de ce poste Data Center Construction - Project Manager (Relocation Assistance Available) chez Serverfarm

Serverfarm · Sur site · Clarksville, AR
Serverfarm is a leading developer and operator of data centers with over 750+ locations and key customer relationships in 45 countries. We're revolutionizing how data centers operate across North America, Western Europe, and Israel, serving the world's leading technology and hyperscale companies. With Manulife Investment Management's acquisition in 2023 and our award-winning InCommand platform we're positioned for explosive growth as AI adoption and cloud migration drive unprecedented demand for data center capacity.

A career at Serverfarm means being at the forefront of digital infrastructure innovation, where your work directly impacts how the world's data is managed and secured. As we target 4x growth over the next four years, you'll have unprecedented opportunities to take on new challenges, develop cutting-edge skills, and grow your career across our expanding global operations.

Join our team of innovators and help shape the future of sustainable data centers while building a career without boundaries.

THIS POSITION WILL SIT IN CLARKSVILLE, AR (RELOCATION ASSISTANCE AVAILABLE)

Key Accountabilities

  • Lead all aspects of our data center development project within an existing shell building
  • Review and validate scope of work (SOW) documents and pricing from data center vendors
  • Manage the installation and commissioning of critical MEP systems
  • Troubleshoot technical issues during commissioning and construction
  • Ensure project is delivered on-time and on-budget while meeting technical specifications
  • Be physically present on-site at least 80% of the time
  • Communicate project updates to internal stakeholders and leadership
  • Collaborate with Serverfarm Operations to ensure built projects meet operational requirements
  • Required Skills

  • 7+ years of experience in data center project management
  • Strong understanding of data center design, construction, and commissioning processes
  • Experience with critical MEP systems for data centers
  • Experience reviewing data center SOWs and validating pricing for specialty vendors
  • Proven ability to troubleshoot technical issues during commissioning phase
  • Excellent project management skills, including budgeting, scheduling, and resource management
  • Strong communication and interpersonal skills
  • The ability to be on-site 80%+ of the time
  • Preferred Skills

  • Bachelor's degree in Construction Management, Electrical Engineering, Mechanical Engineering, or related field
  • PMP or similar project management certification
  • Experience with commissioning procedures for data center facilities
  • Knowledge of industry standards (Uptime Institute, TIA, etc.)
  • Experience working with local permitting authorities

  • Serverfarm is committed to providing an equal opportunity workplace and offers paid time off, paid holidays, 401k and FULL coverage medical, dental and vision. Our compensation philosophy rewards employees for achieving the values and objectives aligned with the company’s goals and strategic initiatives.
     
    The listed salary range for this position is an estimate based on the competitive job market. Final compensation will be based on your own individual skills, experience, and location.
     
    The above statements are intended to describe the general nature and level of work being performed in this role. They are not intended to serve as an exhaustive list of all possible responsibilities and duties. We encourage you to apply even if your experience isn't an exact match to the job description.

    The listed salary range for this position is an estimate based on the competitive job market. Final compensation will be based on your own individual skills, experience, and location.

    The above statements are intended to describe the general nature and level of work being performed in this role. They are not intended to serve as an exhaustive list of all possible responsibilities and duties. We encourage you to apply even if your experience isn't an exact match to the job description.
    Prêt à postuler chez Serverfarm ?
    Postuler chez Serverfarm

    Emplois similaires

    Serverfarm
    Data Center Site Manager (Relocation Assistance Available)
    Serverfarm
    ⚡ Postuler tôt Remote, USA · lieu restreint
    ● Nouveau 👁 Vu ✓ Postulé il y a 2 mois
    Redwood Materials
    Senior Construction Field Manager
    Redwood Materials
    ⚡ Postuler tôt McCarran, NV Sur site
    ● Nouveau 👁 Vu ✓ Postulé il y a 2 h
    Winthrop Technologies
    Digital Transformation Manager | Pre-Construction & Estimating
    Winthrop Technologies
    ⚡ Postuler tôt Dublin, County Dublin, Ireland Sur site
    ● Nouveau 👁 Vu ✓ Postulé il y a 4 h
    Ecosystem
    Senior Project Manager- Construction
    Ecosystem
    ⚡ Postuler tôt Boston, MA Sur site $140,000–$190,000
    ● Nouveau 👁 Vu ✓ Postulé il y a 5 h
    Redwood Materials
    Construction Quality Assurance/Quality Control Manager, EPC
    Redwood Materials
    ⚡ Postuler tôt McCarran, NV Sur site
    ● Nouveau 👁 Vu ✓ Postulé il y a 5 h
    Infrastructureand Capital Projects
    Accenture Construct – Construction Manager, Rail & Transit, ANS
    Infrastructureand Capital Projects
    ⚡ Postuler tôt New York City, NY Sur site
    ● Nouveau 👁 Vu ✓ Postulé il y a 7 h
    DoorDash USA
    Site Manager, DashMart
    DoorDash USA
    ⚡ Postuler tôt Los Angeles, CA Sur site $64,800–$95,300
    ● Nouveau 👁 Vu ✓ Postulé il y a 7 h
    Gotion, Inc.
    Construction Manager
    Gotion, Inc.
    ⚡ Postuler tôt Manteno, Illinois Sur site $140,000–$200,000
    ● Nouveau 👁 Vu ✓ Postulé il y a 8 h
    Gotion, Inc.
    Program Manager, Construction & Energy Infrastructure
    Gotion, Inc.
    ⚡ Postuler tôt Manteno, Illinois Sur site $155,000–$200,000
    ● Nouveau 👁 Vu ✓ Postulé il y a 8 h

    Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

    Plus d’emplois chez Serverfarm

    Voir tous les emplois chez Serverfarm →

    Postuler maintenant
    🤖

    Doucement — un instant

    JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

    Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

    Catch your next role the second it’s posted.

    Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

    Create free account

    Free forever · takes 30 seconds · already have one?

    Prenez une longueur d’avance dans votre recherche d’emploi.

    Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

    Rejoindre le canal — c’est gratuit