Jobs › Companies › Serverfarm › Data Center Construction - Project Manager (Relocation Assistance Available)

Über diese Data Center Construction - Project Manager (Relocation Assistance Available) Stelle bei Serverfarm

Serverfarm · Vor Ort · Clarksville, AR
Serverfarm is a leading developer and operator of data centers with over 750+ locations and key customer relationships in 45 countries. We're revolutionizing how data centers operate across North America, Western Europe, and Israel, serving the world's leading technology and hyperscale companies. With Manulife Investment Management's acquisition in 2023 and our award-winning InCommand platform we're positioned for explosive growth as AI adoption and cloud migration drive unprecedented demand for data center capacity.

A career at Serverfarm means being at the forefront of digital infrastructure innovation, where your work directly impacts how the world's data is managed and secured. As we target 4x growth over the next four years, you'll have unprecedented opportunities to take on new challenges, develop cutting-edge skills, and grow your career across our expanding global operations.

Join our team of innovators and help shape the future of sustainable data centers while building a career without boundaries.

THIS POSITION WILL SIT IN CLARKSVILLE, AR (RELOCATION ASSISTANCE AVAILABLE)

Key Accountabilities

  • Lead all aspects of our data center development project within an existing shell building
  • Review and validate scope of work (SOW) documents and pricing from data center vendors
  • Manage the installation and commissioning of critical MEP systems
  • Troubleshoot technical issues during commissioning and construction
  • Ensure project is delivered on-time and on-budget while meeting technical specifications
  • Be physically present on-site at least 80% of the time
  • Communicate project updates to internal stakeholders and leadership
  • Collaborate with Serverfarm Operations to ensure built projects meet operational requirements
  • Required Skills

  • 7+ years of experience in data center project management
  • Strong understanding of data center design, construction, and commissioning processes
  • Experience with critical MEP systems for data centers
  • Experience reviewing data center SOWs and validating pricing for specialty vendors
  • Proven ability to troubleshoot technical issues during commissioning phase
  • Excellent project management skills, including budgeting, scheduling, and resource management
  • Strong communication and interpersonal skills
  • The ability to be on-site 80%+ of the time
  • Preferred Skills

  • Bachelor's degree in Construction Management, Electrical Engineering, Mechanical Engineering, or related field
  • PMP or similar project management certification
  • Experience with commissioning procedures for data center facilities
  • Knowledge of industry standards (Uptime Institute, TIA, etc.)
  • Experience working with local permitting authorities

  • Serverfarm is committed to providing an equal opportunity workplace and offers paid time off, paid holidays, 401k and FULL coverage medical, dental and vision. Our compensation philosophy rewards employees for achieving the values and objectives aligned with the company’s goals and strategic initiatives.
     
    The listed salary range for this position is an estimate based on the competitive job market. Final compensation will be based on your own individual skills, experience, and location.
     
    The above statements are intended to describe the general nature and level of work being performed in this role. They are not intended to serve as an exhaustive list of all possible responsibilities and duties. We encourage you to apply even if your experience isn't an exact match to the job description.

    The listed salary range for this position is an estimate based on the competitive job market. Final compensation will be based on your own individual skills, experience, and location.

    The above statements are intended to describe the general nature and level of work being performed in this role. They are not intended to serve as an exhaustive list of all possible responsibilities and duties. We encourage you to apply even if your experience isn't an exact match to the job description.
    Bereit, sich bei Serverfarm zu bewerben?
    Bei Serverfarm bewerben

    Ähnliche Jobs

    Serverfarm
    Data Center Site Manager (Relocation Assistance Available)
    Serverfarm
    ⚡ Früh bewerben Remote, USA · standortgebunden
    ● Neu 👁 Gesehen ✓ Beworben vor 2 Mon.
    Airwallex
    Staff Product Manager, Corporate Site (Growth)
    Airwallex
    ⚡ Früh bewerben US - San Francisco Hybrid $190,000–$270,000
    ● Neu 👁 Gesehen ✓ Beworben vor 1 Std.
    Redwood Materials
    Construction Quality Assurance/Quality Control Manager, EPC
    Redwood Materials
    ⚡ Früh bewerben McCarran, NV Vor Ort
    ● Neu 👁 Gesehen ✓ Beworben vor 3 Std.
    Redwood Materials
    Senior Construction Field Manager
    Redwood Materials
    ⚡ Früh bewerben McCarran, NV Vor Ort
    ● Neu 👁 Gesehen ✓ Beworben vor 4 Std.
    Winthrop Technologies
    Digital Transformation Manager | Pre-Construction & Estimating
    Winthrop Technologies
    ⚡ Früh bewerben Dublin, County Dublin, Ireland Vor Ort
    ● Neu 👁 Gesehen ✓ Beworben vor 9 Std.
    Ecosystem
    Senior Project Manager- Construction
    Ecosystem
    ⚡ Früh bewerben Boston, MA Vor Ort $140,000–$190,000
    ● Neu 👁 Gesehen ✓ Beworben vor 9 Std.
    Infrastructureand Capital Projects
    Accenture Construct – Construction Manager, Rail & Transit, ANS
    Infrastructureand Capital Projects
    ⚡ Früh bewerben New York City, NY Vor Ort
    ● Neu 👁 Gesehen ✓ Beworben vor 12 Std.
    DoorDash USA
    Site Manager, DashMart
    DoorDash USA
    ⚡ Früh bewerben Los Angeles, CA Vor Ort $64,800–$95,300
    ● Neu 👁 Gesehen ✓ Beworben vor 12 Std.
    Allucent
    Site Contract & Budget Manager (Europe)
    Allucent
    ⚡ Früh bewerben Belgrade, Vojvodina, Serbia Vor Ort
    ● Neu 👁 Gesehen ✓ Beworben vor 12 Std.

    Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

    Mehr Jobs bei Serverfarm

    Alle Jobs bei Serverfarm ansehen →

    Jetzt bewerben
    🤖

    Moment — langsam

    JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

    Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

    Catch your next role the second it’s posted.

    Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

    Create free account

    Free forever · takes 30 seconds · already have one?

    Verschaffe dir einen Vorsprung bei der Jobsuche.

    Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

    Dem Kanal beitreten — kostenlos