Jobs › Companies › Cumming Group › Construction Scheduler

À propos de ce poste Construction Scheduler chez Cumming Group

Cumming Group · Sur site · Los Angeles, CA

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



Our firm is currently hiring a Construction Scheduler based in the Los Angeles, CA area to support public works project types. The Construction Scheduler will develop, maintain, and report on schedules for a portfolio of recovery and rebuild capital projects. This is an outstanding opportunity to bring your specialized construction scheduling expertise to an industry leading team.


Essential Duties & Responsibilities:

  • Develop and maintain comprehensive project schedules, identify relationships, logic, milestones, and constraints for a large public agency Capital Improvement Program (CIP).
  • Review contractor baseline schedule submissions to verify that all work scope is properly identified and logically sequenced. Provide detailed written comments and feedback to ensure alignment with project objectives and timelines.
  • Perform quality assurance and quality control (QA/QC) on contractor schedule submittals, ensuring conformance with the contract. Review critical path, cost loading, resource loading (man-hours), schedule content, recovery schedules, logic relationships, lags, constraints, and milestones for accuracy and completeness.
  • Perform time impact analysis for any change orders that affect the construction schedule and participate in negotiations between the client Project Manager and contractors to resolve delay time settlements and mitigate schedule impacts.
  • Conduct critical path analysis and earned value analysis regularly to ensure that construction projects remain on track and meet time and budget requirements. Provide reports to identify potential issues and corrective actions.
  • Regularly perform QA/QC reviews on program schedules and master schedules to ensure accuracy and compliance with program standards. Ensure proper use of program-level standard codes, layouts, and reports to maintain data integrity.

Required Education and Experience:

  • Bachelor's degree in Construction Management, Engineering, Architecture, or related field.
  • Minimum of ten (10) years of experience in creating, updating, and maintaining project schedules for public agency CIP projects.
  • Advanced proficiency in scheduling software, including Primavera P6 and Microsoft Project.
  • Ability to develop critical path method (CPM) baseline schedules and maintain them through regular updates.
  • Ability to build and maintain an integrated master program schedule across multiple concurrent projects.
  • Ability to prepare and evaluate time impact analyses and delay claims.
  • Ability to perform resource loading and cost loading and to support earned value reporting.
  • Ability to produce clear schedule narratives, look-ahead schedules, milestone reports, and executive level summaries.
  • Effective oral and written communication skills.
  • Experience with disaster recovery or post-disaster rebuild programs preferred.

#LI-SV1

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $120,200.00-$160,266.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
Prêt à postuler chez Cumming Group ?
Postuler chez Cumming Group

À propos de Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Voir tous les emplois chez Cumming Group →

Emplois similaires

Cumming Group
Sr. Technical PM - Civil, Structural & Architectural (Data Center)
Cumming Group
⚡ Postuler tôt Charlotte, NC Sur site $133,100–$186,367
● Nouveau 👁 Vu ✓ Postulé il y a 10 h
Cumming Group
Senior Project Manager - Data Center Construction
Cumming Group
⚡ Postuler tôt Anaheim, CA Sur site $132,800–$231,667
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
QA/QC Manager - Datacenter Construction
Cumming Group
⚡ Postuler tôt Charlotte, NC Sur site $93,000–$124,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Senior Project Manager - Data Center Construction
Cumming Group
⚡ Postuler tôt Burbank, CA Sur site $132,800–$231,667
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Construction Project Manager (EV Charging)
Cumming Group
⚡ Postuler tôt USA Home Office - Kansas · lieu restreint $93,000–$124,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Senior Project Manager - Data Center Construction
Cumming Group
⚡ Postuler tôt Stockton, CA Sur site $132,800–$231,667
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Senior Project Manager
Cumming Group
⚡ Postuler tôt Los Angeles, CA Sur site $132,800–$185,933
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Cost Control Manager
Cumming Group
⚡ Postuler tôt Los Angeles, CA Sur site $120,200–$160,267
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Cumming Group
Senior Project Manager - Data Center Construction
Cumming Group
⚡ Postuler tôt Stockton, CA Sur site $132,800–$231,667
● Nouveau 👁 Vu ✓ Postulé il y a 2 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Cumming Group

Voir tous les emplois chez Cumming Group →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit