Jobs › Companies › Cumming Group › Senior Project Manager - Data Center Construction

À propos de ce poste Senior Project Manager - Data Center Construction chez Cumming Group

Cumming Group · Sur site · Anaheim, CA

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



Job Summary
We are seeking an experienced Senior Project Manager to lead large-scale data center and critical infrastructure construction projects from planning through commissioning and turnover. This role is responsible for managing project scope, budget, schedule, risk, quality, procurement, contractor performance, and stakeholder communication while ensuring successful project execution and delivery.

Key Responsibilities

  • Lead all phases of project delivery, including planning, construction, commissioning, startup, and closeout.
  • Develop and manage project scope, schedules, budgets, cash flow, and risk mitigation strategies.
  • Coordinate activities among clients, engineering teams, contractors, subcontractors, suppliers, QA/QC, and commissioning teams.
  • Oversee MEP systems, construction quality, safety, testing, and commissioning activities.
  • Support procurement efforts, including RFP development, bid evaluation, contractor selection, and contract administration.
  • Monitor project performance, identify schedule, cost, or technical risks, and implement corrective actions.
  • Review engineering drawings, specifications, change orders, and technical construction documentation.
  • Provide clear reporting and leadership while driving cross-functional collaboration and successful project outcomes.

Qualifications

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred.
  • 7+ years of experience managing data center, mission-critical, or large-scale construction projects.
  • Strong understanding of MEP systems, project controls, budgeting, scheduling, QA/QC, commissioning, and contractor management.
  • Ability to interpret engineering and construction documents and manage complex technical projects.
  • Excellent leadership, communication, organizational, and problem-solving skills.
  • Experience with hyperscale data centers, critical infrastructure, or AWS environments preferred.


#LI-SJ2

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $132,800.00-$231,666.72 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
Prêt à postuler chez Cumming Group ?
Postuler chez Cumming Group

Comment se compare ce salaire pour Project Manager

Ce poste paie $182,233/yr — au-dessus de la fourchette habituelle pour les postes Project Manager.

$79,857 la médiane $126,800 $177,500

Fourchette typique $102,500–$151,706/yr, à partir de 3,274 annonces Project Manager comparables sur JobsRadar (rémunération annualisée en USD). Voir les aperçus de salaire pour Project Manager →

À propos de Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Voir tous les emplois chez Cumming Group →

Emplois similaires

SE
Senior Project Manager (Yerington, NV)
SOLV Energy
⚡ Postuler tôt Yerington, NV Sur site $141,590–$176,987
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
DI
Project Manager
Disney
⚡ Postuler tôt Anaheim, CA, USA Sur site $126,000–$154,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 mois
Quandela
Senior Project Manager - Quantum Research
Quandela
⚡ Postuler tôt Massy, Île-de-France, France Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
Master-Works
AI Project Manager, Senior
Master-Works
⚡ Postuler tôt Riyadh, Riyadh Province, Saudi... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
DTN
Senior Implementation Project Manager
DTN
⚡ Postuler tôt Dallas, TX Sur site $84,500–$113,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
Sentry Insurance
Retirement Plan Project Manager
Sentry Insurance
⚡ Postuler tôt Stevens Point, WI Hybride $61,900–$92,900
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
Wilson & Company
Transportation Project Manager
Wilson & Company
⚡ Postuler tôt Phoenix, Arizona Sur site $140,000–$170,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
Invenergy
Manager, Project Controls Cost & Scheduling
Invenergy
⚡ Postuler tôt Chicago, IL Hybride $118,000–$165,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 h
Zayo
OSP Facilities Long Haul Deployment Construction Project Manager - ILA Construction
Zayo
⚡ Postuler tôt United States Sur site $77,100–$118,600
● Nouveau 👁 Vu ✓ Postulé il y a 6 h

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Cumming Group

Voir tous les emplois chez Cumming Group →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit