Jobs Companies QTS Data Centers Development Program Manager (Data Center Construction MEPR)

Über diese Development Program Manager (Data Center Construction MEPR) Stelle bei QTS Data Centers

QTS Data Centers · Vor Ort · Denver, CO

Who we are:

As a global leader in digital infrastructure, QTS designs, builds and operates advanced data centers that support strategic AI, cloud and digital transformation initiatives. We are driven by a mission to connect the world for good and our people make it possible. Every single day, the creativity, dedication and genuine care for our communities are what push us forward and make this a truly special place to be. 

Who we are:

It's pretty exciting to find yourself standing in a pivotal moment in time. It’s even more exciting to be out front leading it. At QTS, our world-class data centers are supporting our customers’ most strategic growth initiatives, positioning us at the forefront of today’s dynamic digital transformation. 

As AI and cloud drive the demand for increased speed, capacity and capability, QTS has emerged as the global digital infrastructure leader, committed to connecting the world for good. Driven by purpose and fueled by a spirit of innovation, QTS designs, builds and operates some of the world’s most advanced, forward-thinking data centers. QTS is a portfolio company of Blackstone.

QTS is Powered by People. People who play a vital role in our company’s culture, innovation and growth. People who are committed to contributing to the communities where we operate and work. People who are knowledgeable, resourceful and mission driven. Together, we do great things.

Who You Are and the Impact You Will Have:

The Development Program Manager (Data Center Construction MEPR) is primarily responsible for leading and managing the design, pre-construction and construction activities on a given project. The Development Program Manager (Data Center Construction MEPR) will interact on a daily basis with Facilities, Contractors, Designers, Engineers, Commissioning Agents, Vendors, and Data Center Operations staff and should have both written and oral communication skills commensurate with this level of regular communication.

What You Will Do:

  • Manage multiple projects on a campus(es) and maintain updated budgets, schedules, and status reports for each

  • Create and communicate updates on development program & project status on a monthly basis suitable for executive level reviews. Effectively present information in a manner to support efficient decision making

  • Work with QTS stakeholders, design, and construction teams to create a master development program for site(s), including a complete campus design solution and capital budget.

  • Manage entitlement and permitting needs for each assigned site project(s)

  • Implement and manage multi-phased site development plans to achieve time, budget, and quality standards in a predictable fashion. Continuously update a campus master plan to provide predictable statistics in a dynamic environment

  • Write scopes of work for design, construction, commissioning services & participate in procurement and project cost estimates

  • Evaluate and level pricing proposals for design, construction, and commissioning services

  • Work closely with strategic procurement team on equipment procurement and delivery process

  • Ensure appropriate submittals are coordinated with site stakeholders

  • Monitor & create project budget/cost-to-date against overall project budget.

  • Establish project schedules and manage teams to on-time completion

  • Review and approve monthly pay applications from the contractors

  • Review change order requests from contractors and negotiate pricing

  • Establish site construction security procedures in conjunction with site security team

  • Develop plans for product deployment and review/communicate plans with QTS staff involved

  • Collaborate with Sales Engineers and Product teams to aid in custom deal solutioning for prospective clients within the applicable schedule and budget for an assigned location.

  • Establish and maintain relationships serving as liaison with key QTS stakeholders

  • Represent QTS interests as leader in OAC meetings

  • Create & build relationships that enhance QTS's ability to be a leader in creating the World's Most Valuable Data Center Real Estate

  • Aid in due diligence efforts for potential new sites on an as-needed basis

  • Work with the internal development team to enhance project management processes and protocols

What You Will Need to be Successful (basic qualifications):

  • Bachelor's degree in Science or Engineering or equivalent professional experience
  • Eight or more years of professional experience in commercial construction practices and procedures, including management of Lump Sum, Construction Management at Risk, and Design Build project delivery methods from conceptual development through procurement to close out
  • Experience with Microsoft Office suite, specifically PowerPoint for use in communicating program updates to executive level, and Excel to create and maintain site program & individual project budgets
  • Be able to travel as needed for the business

Other Key Skills:

  • MBA, Masters in Engineering, Management, or related field desirable
  • Experience with delivery of mission critical data center facilities
  • Extensive experience with management of MEP trades

The Perks (and these are just a few!):

  • Q-Rest Sabbatical      
  • Employee Stock Purchase Plan
  • QTS scholarship for dependents
  • Eagle Club Award Trip Eligibility
  • Paid Volunteer and Floating days 
  • Tuition Assistance, Parental Leave and Military Leave Assistance

In accordance with applicable law, the following represents a reasonable estimate of the range of possible compensation for this role if hired in Colorado. Please note that this information is provided for those hired in Colorado only, and this role is open to candidates outside of Colorado with compensation that aligns with your location. The successful candidate’s starting salary will be determined based on permissible, non-discriminatory factors such as skills, experience, and geographic location.


The estimated pay range for this role, if based in Colorado, is:


$143,827.50 - 219,950.60


Please note that this information is provided for those hired in Colorado only, and this role is open to candidates outside of Colorado with compensation that aligns with your location.  The successful candidate’s starting salary will be determined based on permissible, non-discriminatory factors such as skills, experience, and geographic location. This role is also eligible for a competitive benefits package that includes: medical, dental, vision, life, and disability insurance; 401(k) retirement plan; flexible spending savings account; paid holidays; paid time off; employee assistance program; and other company benefits.


We conform to all the laws, statutes, and regulations concerning equal employment opportunities and affirmative action.  We strongly encourage women, minorities, individuals with disabilities and veterans to apply to all of our job openings.  We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, gender, sexual orientation, gender identity, or national origin, age, disability status, Genetic Information & Testing, Family & Medical Leave, protected veteran status, or any other characteristic protected by law.  We prohibit retaliation against individuals who bring forth any complaint, orally or in writing, to the employer or the government, or against any individuals who assist or participate in the investigation of any complaint or discrimination claim.

The "Know Your Rights" Poster is included here:

Know Your Rights (English)

Know Your Rights (Spanish)

The pay transparency policy is available here:

Pay Transparency Nondiscrimination Poster-Formatted

QTS is committed to working with and providing reasonable accommodations to individuals with disabilities. If you need a reasonable accommodation because of a disability for any part of the employment process, please send an e-mail to [email protected] and let us know the nature of your request and your contact information.

Bereit, sich bei QTS Data Centers zu bewerben?
Bei QTS Data Centers bewerben

Wie sich dieses Gehalt für Program Manager vergleicht

Diese Stelle zahlt $181,889/yrüber der üblichen Spanne für Program Manager Stellen.

$105,418 dem Median $143,925 $187,500

Übliche Spanne $120,875–$169,790/yr, aus 33 vergleichbaren Program Manager Anzeigen auf JobsRadar (Vergütung auf USD hochgerechnet). Gehaltseinblicke für Program Manager ansehen →

Über QTS Data Centers

It’s exhilarating to find yourself at a pivotal moment in history— and even more so to be leading the way. At QTS Data Centers, we are proud to stand at the forefront of today’s dynamic digital transformation. Our world-class data centers empower our customers’ most strategic growth initiatives, positioning us as a global leader in digital infrastructure. As AI and cloud technologies fuel the demand for increased speed, capacity, and innovation, QTS has emerged as the global digital infrastructure leader. We are committed to connecting the globe for good. Driven by purpose and a spirit of innovation, we design, build, and operate some of the most advanced data centers worldwide. In addition

Alle Jobs bei QTS Data Centers ansehen →

Ähnliche Jobs

Fastly
Senior Program Manager, Network Infrastructure
Fastly
⚡ Früh bewerben Denver, CO; New York City, NY;... Vor Ort $142,630–$195,000
● Neu 👁 Gesehen ✓ Beworben vor 21 Std.
Candid Health
Technical Program Manager - Platform
Candid Health
⚡ Früh bewerben San Francisco (CA), Denver (C... Vor Ort $165,000–$210,000
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Candid Health
Technical Program Manager - Implementation
Candid Health
⚡ Früh bewerben San Francisco (CA), Denver (C... Vor Ort $165,000–$210,000
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Crusoe
HSE Program Manager
Crusoe
⚡ Früh bewerben Denver, CO - US Vor Ort $120,000–$145,000
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Planet
Technical Program Manager, Trade Compliance
Planet
⚡ Früh bewerben Washington, DC; Denver, CO Hybrid $136,000–$170,000
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
Quindar
Technical Program Manager, Commercial
Quindar
⚡ Früh bewerben Denver, CO Hybrid $150,000–$175,000
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
Planet
Technical Program Manager, Solutions
Planet
⚡ Früh bewerben Denver, CO Hybrid $127,000–$158,700
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
JLL
CMMS Program Manager
JLL
⚡ Früh bewerben Dallas, TX Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
TA
Sr. Manager, Program Finance
True Anomaly
⚡ Früh bewerben Denver, CO or Long Beach, CA Hybrid
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei QTS Data Centers

Alle Jobs bei QTS Data Centers ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos