Jobs › Companies › QTS Data Centers › Senior Development Project Manager (Data Center Construction MEPR)

À propos de ce poste Senior Development Project Manager (Data Center Construction MEPR) chez QTS Data Centers

QTS Data Centers · Sur site · US UT Eagle Mountain 2 DC1

Who we are:

As a global leader in digital infrastructure, QTS designs, builds and operates advanced data centers that support strategic AI, cloud and digital transformation initiatives. We are driven by a mission to connect the world for good and our people make it possible. Every single day, the creativity, dedication and genuine care for our communities are what push us forward and make this a truly special place to be. 


Who we are:

It's pretty exciting to find yourself standing in a pivotal moment in time. It’s even more exciting to be out front leading it. At QTS, our world-class data centers are supporting our customers’ most strategic growth initiatives, positioning us at the forefront of today’s dynamic digital transformation. 

As AI and cloud drive the demand for increased speed, capacity and capability, QTS has emerged as the global digital infrastructure leader, committed to connecting the world for good. Driven by purpose and fueled by a spirit of innovation, QTS designs, builds and operates some of the world’s most advanced, forward-thinking data centers. QTS is a portfolio company of Blackstone.

QTS is Powered by People. People who play a vital role in our company’s culture, innovation and growth. People who are committed to contributing to the communities where we operate and work. People who are knowledgeable, resourceful and mission driven. Together, we do great things.

Who You Are & the Impact You Will Have:

The Senior Development Project Manager (Data Center Construction MEPR) is primarily responsible for leading and managing the design, preconstruction and construction activities on a given project(s).  The Senior Project Manager (Data Center Construction MEPR) will interact on a daily basis with Facilities, Contractors, Designers, Engineers, Commissioning Agents, Vendors, and Data Center Operations staff and should have both written and oral communication skills commensurate with this level of regular communication. 
 

What You Will Do:

  • Manage multiple projects on a campus(es) and maintain updated budgets, schedules, and status reports for each

  • Create and communicate updates on development program & project status on a monthly basis suitable for executive level reviews. Effectively present information in a manner to support efficient decision making

  • Work with QTS stakeholders, design, and construction teams to create a master development program for site(s), including a complete campus design solution and capital budget.

  • Manage entitlement and permitting needs for each assigned site project(s)

  • Implement and manage multi-phased site development plans to achieve time, budget, and quality standards in a predictable fashion. Continuously update a campus master plan to provide predictable statistics in a dynamic environment

  • Write scopes of work for design, construction, commissioning services & participate in procurement and project cost estimates

  • Evaluate and level pricing proposals for design, construction, and commissioning services

  • Work closely with strategic procurement team on equipment procurement and delivery process

  • Ensure appropriate submittals are coordinated with site stakeholders

  • Monitor & create project budget / cost-to-date against overall project budget.

  • Establish project schedules and manage teams to on-time completion

  • Review and approve monthly pay applications from the contractors

  • Review change order requests from contractors and negotiate pricing

  • Establish site construction security procedures in conjunction with site security team

  • Develop plans for product deployment and review / communicate plans with QTS staff involved

  • Collaborate with Sales Engineers and Product teams to aid in custom deal solutioning for prospective clients within the applicable schedule and budget for an assigned location.

  • Establish and maintain relationships serving as liaison with key QTS stakeholders

  • Represent QTS Interests as leader in OAC meetings

  • Create & build relationships that enhance QTS’s ability to be a leader in creating the World’s Most Valuable Data Center Real Estate

  • Aid in due diligence efforts for potential new sites on an as-needed basis

  • Work with the internal development team to enhance project management processes and protocols

What You Will Need to be Successful (basic qualifications):

  • Bachelor’s degree in Science or Engineering or equivalent professional experience

  • Five or more years of professional experience in commercial construction practices and procedures, including management of Lump Sum, Construction Management @ Risk, and Design Build project delivery methods from conceptual development through procurement to close out

  • Experience with Microsoft Office suite, specifically PowerPoint for use in communicating program updates to executive level, and Excel to create and maintain site program & individual project budgets

  • Be able to travel up to 50% of the time

  • US Citizenship for this position is required by law due to federal customer contracts

Other Key Skills:

  • MBA, Masters in Engineering, Management, or related field desirable

  • Experience with delivery of mission critical data center facilities

  • Extensive experience with management of MEP trades

The Perks (and these are just a few!):

  • Q-Rest Sabbatical      

  • Employee Stock Purchase Plan

  • QTS scholarship for dependents

  • Eagle Club Award Trip Eligibility

  • Paid Volunteer and Floating days 

  • Tuition Assistance, Parental Leave and Military Leave Assistance

The duties and responsibilities described here are not exhaustive and additional assignments, duties, or responsibilities may be required of this position.  Assignments, duties, and responsibilities may be changed at any time, with or without notice, by QTS in its sole discretion. We provide individuals with disabilities reasonable accommodations to participate in the job application or interview process, to perform essential job functions, and to receive other benefits and privileges of employment in accordance with applicable law. Please contact us to request an accommodation on [email protected]

Prêt à postuler chez QTS Data Centers ?
Postuler chez QTS Data Centers

À propos de QTS Data Centers

It’s exhilarating to find yourself at a pivotal moment in history— and even more so to be leading the way. At QTS Data Centers, we are proud to stand at the forefront of today’s dynamic digital transformation. Our world-class data centers empower our customers’ most strategic growth initiatives, positioning us as a global leader in digital infrastructure. As AI and cloud technologies fuel the demand for increased speed, capacity, and innovation, QTS has emerged as the global digital infrastructure leader. We are committed to connecting the globe for good. Driven by purpose and a spirit of innovation, we design, build, and operate some of the most advanced data centers worldwide. In addition

Voir tous les emplois chez QTS Data Centers →

Emplois similaires

Scopely
Senior Project Manager
Scopely
⚡ Postuler tôt ES - Barcelona, Spain Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 3 h
Luminis Health
Project Manager II- Construction - AAMC
Luminis Health
⚡ Postuler tôt Annapolis, MD Sur site $78,198–$117,297
● Nouveau 👁 Vu ✓ Postulé il y a 7 h
TOMORROW HIRE
Project Manager PMP
TOMORROW HIRE
⚡ Postuler tôt Mechanicsville, Virginia, Unit... Hybride $114,400–$156,000
● Nouveau 👁 Vu ✓ Postulé il y a 7 h
Roblox
Facilities Project Manager
Roblox
⚡ Postuler tôt San Mateo, CA, United States Sur site $136,100–$166,730
● Nouveau 👁 Vu ✓ Postulé il y a 7 h
Catawiki
Commercial Operations Project Manager (Trust Operations Excellence)
Catawiki
⚡ Postuler tôt Netherlands Hybride
● Nouveau 👁 Vu ✓ Postulé il y a 12 h
Unisys
Client Project Management Manager
Unisys
⚡ Postuler tôt Bangalore, KA, India Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 15 h
Veolia
Project Manager (Engineering)
Veolia
⚡ Postuler tôt Kilkenny Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 15 h
Vizient
Sr. Program Manager (Healthcare- Project Management)
Vizient
⚡ Postuler tôt Irving, TX 75062 Vizient Corpo... Sur site $88,900–$155,500
● Nouveau 👁 Vu ✓ Postulé il y a 15 h
BL
Project Manager
BlueScope
⚡ Postuler tôt CA-Visalia Sur site $77,300–$91,730
● Nouveau 👁 Vu ✓ Postulé il y a 15 h

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez QTS Data Centers

Voir tous les emplois chez QTS Data Centers →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit