Jobs › Companies › Secretariat › Manager, Construction Delay -Multiple Openings

À propos de ce poste Manager, Construction Delay -Multiple Openings chez Secretariat

Secretariat · Sur site · Houston, Texas, United States

Chart Your Journey at Secretariat

From a collaborative culture to teammates who will always be by your side, find a career that will grow with you. Deliver your impact at Secretariat.

 

ABOUT THE FIRM

Secretariat professionals are trusted in the highest-stakes legal, risk, and regulatory matters around the world.

When you join Secretariat, you become part of a rapidly growing elite team of bright minds and passionate problem-solvers. Your skills and expertise will be utilized on day one – working with the world’s most renowned law firms, leading corporations, and influential institutions to answer complex questions that shape critical financial, economic, and strategic business decisions.

Our globally integrated teams are united by the ambition, energy, and commitment they bring to every challenge. We inspire and empower an open, collaborative culture that embraces ongoing professional development, recognition, diversity, and – most importantly – you.

Make your impact at Secretariat.

ABOUT OUR CONSTRUCTION DELAY TEAM

When it comes to understanding the details that have an impact on costly and disruptive construction delays, we have built a reputation that stands above all with decades of experience as engineers, project managers, architects, schedulers, and accountants. Our team is trusted for their sophisticated delay analysis involved in the biggest projects developed around the world, including notable buildings, infrastructure, power & utilities, and oil & gas works. That's why our team was honored as Who's Who Legal's Construction Expert Witness Firm of the Year for 2024.

Responsibilities:

Hybrid positions (multiple openings) with ability to telecommute 2 days per week. Requirement to be in the Houston, TX office 3 times per week. Critical path method schedule analysis based on mastery and use of accepted methodologies as set out in AACEI 29R-03 and SLC Protocol. Use software Primavera and MS Project is also required. Quantification of monetary damages for delay, productivity loss, and other engineering and construction related costs in accordance with accepted procedures and methodologies such as the measured mile, earned value analysis and discrete pricing. Analytical familiarity with engineering processes and procedures, common contracting mechanisms and provisions in contracts, procurement practices, construction practices, commissioning and job closeout. Write technical reports outlining issues identified through research and analysis and explaining delay and quantum cause and effect and accepted methodologies that are the basis of analytical findings.

**Position requires 10% of domestic travel.

Requirements:

This position requires a Bachelor's degree or foreign equivalent in Building Construction, Technology Project Management, Civil Engineering, or related field and 5 years of relevant experience in engineering or engineering consulting role related to civil, mechanical or industrial engineering; OR a Master's degree or foreign equivalent in Building Construction, Technology Project Management, Civil Engineering, or related field and 3 years of relevant experience in engineering or engineering consulting role related to civil, mechanical or industrial engineering.

This position also requires experience with the following skills:

  • 3 years of experience using scheduling software - Primavera and MS Project.
  • 3 years of experience analyzing complex data sets using advanced Excel including pivot tables/power pivots/macros/graphical visualization.
  • 3 years of experience using cost estimating software (RS Means OR Xactiexcemate).
  • 3 years of experience with Forensic Analysis - Critical Path Method delay analysis and damages analysis and quantification relating to construction projects.
  • 3 years of experience analyzing complex construction schedules, identifying project delays. and applying appropriate industry-accepted methodology for Critical Path Method schedule analysis in litigation or dispute resolution scenarios.
  • 3 years of experience evaluating parties' contractual obligations (nor>-legal), performing comprehensive fact-based assessment of issues, and developing damage models utilizing industry-accepted methodology for calculating construction damages in litigation or dispute resolution scenarios.

A rewarding career above all

There are a lot of fine consulting firms out there. But when everything is on the line, it takes a unique combination of skill and savvy to succeed under pressure.

Our culture and people are driven by passion, pride, and performance. Passion for the clients we serve, the work we deliver, and the communities we live in. Pride in our cohesive team recognized for excellence and trusted to perform in the most challenging situations. And our track record of outstanding performance across all of our disciplines speaks for itself.

Our people are motivated to be the best in everything they do – from our approach to making the complex simple to the way we mentor our up-and-coming talent to become trusted experts early in their careers.

To learn how Secretariat collects, uses, and protects your personal information during the recruitment process, please review our Privacy Policy

 

Prêt à postuler chez Secretariat ?
Postuler chez Secretariat

Emplois similaires

Secretariat
Associate Director, Mechanical Engineer
Secretariat
⚡ Postuler tôt New Orleans, Louisiana, United... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 13 h
Secretariat
Associate Director, Damages & Valuations
Secretariat
⚡ Postuler tôt Denver, Colorado, United State... Sur site $150,000–$182,000
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Secretariat
Associate, Engineering Sciences - Electrical Engineering
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $92,500–$105,000
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Secretariat
Manager, Financial Services Disputes & Valuation
Secretariat
⚡ Postuler tôt Washington, District of Columb... Sur site $130,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Secretariat
Manager, Analytics and Data Strategy
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $130,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Secretariat
Communications Manager
Secretariat
⚡ Postuler tôt Atlanta, Georgia, United State... Sur site $100,000–$130,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Editorial Manager 
Secretariat
⚡ Postuler tôt Atlanta, Georgia, United State... Sur site $100,000–$130,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Manager, Construction Delay
Secretariat
⚡ Postuler tôt Houston, Texas, United States;... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.
Secretariat
Manager, Engineering Sciences - Batteries
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $135,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Secretariat

Voir tous les emplois chez Secretariat →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit