Jobs › Companies › CACI › Earned Value Program Control Analyst

À propos de ce poste Earned Value Program Control Analyst chez CACI

CACI · Sur site · Denver, CO, US
Job Title: Earned Value Program Control Analyst

Job Category: Project and Program Management

Time Type: Full time

Minimum Clearance Required to Start: TS/SCI

Employee Type: Regular

Percentage of Travel Required: Up to 25%

Type of Travel: Continental US

Anticipated Posting End: 10/30/2026

The Opportunity:

The candidate will work on site along with other Program Management Office (PMO) personnel. Working under the direction of the Program Manager, the Program Management Office is responsible for executing CACI’s Earned Value Management System (EVMS), maintaining the program’s Integrated Master Schedule, monitoring invoices and projecting expenditures, proposing and executing contract modifications, and forecasting and reporting the program’s cost/schedule/performance status to both the customer and CACI executives. Successful candidates will analyze historical program performance, monitor the forecasted completion data, interface directly with the customer's on-site personnel, and support recommendations made to the CACI executives, Program Managers, and Control Account Managers.

Reasonabilities:
- Provide on-site project and earned value management support and coordination
- Assist with the development of the program's cost and schedule baseline
- Assist with the review and reporting of performance updates from the program’s Control Account Managers
- Support senior EV Analysts as they brief Government personnel regarding EVM and schedule performance
- Monitor ongoing procedures (e.g., Baseline Change Requests (BCRs), Schedule Management, Variance Analysis) for efficiency/effectiveness, and coordinate with program control teams to implement process improvements
- Assist the program to develop program-specific standards and process instructions for planning, scheduling, baseline control, EVMS, financial controls, subcontract cost integration, and Integrated Program Management Report (IPMDAR) compilation and analysis
- Assist the program to develop the program's cost and schedule baseline to be presented at formal Integrated Baseline Reviews (IBRs) with the Government
- Assist with the transfer of data from the team’s Integrated Master Schedule to the team’s Earned Value system and validate data accuracy.
- Develop and maintain EV artifacts and other program documentation related to ad hoc deliverables to the customer and to CACI leadership, as well as evidence to present during quarterly DoD surveillance audits

Qualifications:

Required:
- Active TS/SCI clearance
- Established and productive professional individual contributor
- Ability to work independently with general supervision
- Basic knowledge of Earned Value definitions and calculations
- Ability to analyze and determine a resolution for problems/questions that may be challenging but typically not complex
- Ensure compliance with internal procedures and government cost/schedule reporting regulations
- Perform non-routine analysis and prepare non-routine performance reports
- Strong organizational skills and attention to detail
- Skilled in Microsoft Excel
- Proficiency with other MS Office products (Outlook, Word, Power Point, Project, Visio and SharePoint)
- Bachelor's degree in a quantitative discipline (e.g., economics, engineering, mathematics, operations research, statistics or business) or a discipline that fosters problem solving, structured analysis and creativity
- On-the-job and formal training will be provided to motivated candidates who have the desire to expand their skills and apply their knowledge to improve the team’s overall performance

Desired:
- Working knowledge of Earned Value definitions and calculations
- Experience with Program Control software such as Deltek COBRA, EMPOWER,SSI Tools or Microsoft Project
- Familiarity with DoD Contracting environment
- Experience with corporate finance procedures
- Experience with formulating forecast models using historical information to estimate future cost/performance

 

-


What You Can Expect:

 A culture of integrity.

At CACI, we place character and innovation at the center of everything we do. As a valued team member, you’ll be part of a high-performing group dedicated to our customer’s missions and driven by a higher purpose – to ensure the safety of our nation.

An environment of trust.

CACI values the unique contributions that every employee brings to our company and our customers - every day. You’ll have the autonomy to take the time you need through a unique flexible time off benefit and have access to robust learning resources to make your ambitions a reality.

A focus on continuous growth.

Together, we will advance our nation's most critical missions, build on our lengthy track record of business success, and find opportunities to break new ground — in your career and in our legacy.


Pay Range:

There are a host of factors that can influence final salary including, but not limited to, geographic location, Federal Government contract labor categories and contract wage rates, relevant prior work experience, specific skills and competencies, education, and certifications. Our employees value the flexibility at CACI that allows them to balance quality work and their personal lives. We offer competitive compensation, benefits and learning and development opportunities. Our broad and competitive mix of benefits options is designed to support and protect employees and their families. At CACI, you will receive comprehensive benefits such as; healthcare, wellness, financial, retirement, family support, continuing education, and time off benefits.

Since this position can be worked in more than one location, the range shown is the national average for the position.

The proposed salary range for this position is:

$82,100-$172,400

CACI is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, pregnancy, sexual orientation, age, national origin, disability, status as a protected veteran, or any other protected characteristic.

Prêt à postuler chez CACI ?
Postuler chez CACI

À propos de CACI

Click on Search Jobs to find and apply to CACI openings.

Voir tous les emplois chez CACI →

Emplois similaires

CACI
Senior Observability & Reliability Engineer
CACI
⚡ Postuler tôt Reston, VA, US Sur site $90,300–$189,600
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
CACI
VCS Regional Maintenance Technician
CACI
⚡ Postuler tôt Arlington, VA, US Sur site $70,800–$148,600
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
CACI
VCS Regional Maintenance Technician
CACI
⚡ Postuler tôt Arlington, VA, US Sur site $70,800–$148,600
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
CACI
Sensitive Activities Advisor
CACI
⚡ Postuler tôt Camp Lejeune, NC, US Sur site $120,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
CACI
Entry Level Background Investigator - Midwest
CACI
⚡ Postuler tôt 2SQ RAPID CITY SD (TAX JURISDI... Sur site $54,226–$54,226
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
CACI
DevSecOps Engineer (AI/ML)
CACI
⚡ Postuler tôt 590 RESTON VA Sur site $82,100–$172,400
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
CACI
ServiceNow Development Team Lead (TS/SCI with Poly)
CACI
⚡ Postuler tôt Chantilly, VA, US Sur site $103,800–$218,100
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
CACI
Unified Communications Administrator
CACI
⚡ Postuler tôt Washington, DC, US Sur site $90,300–$189,600
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
CACI
Trojan Operations Manager III - TS/SCI
CACI
⚡ Postuler tôt Fort Belvoir, VA, US Sur site $94,400–$198,200
● Nouveau 👁 Vu ✓ Postulé il y a 3 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez CACI

Voir tous les emplois chez CACI →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit