Jobs › Companies › Secretariat › Director, Construction Delay

À propos de ce poste Director, Construction Delay chez Secretariat

Secretariat · Sur site · Atlanta, Georgia, United States

Chart Your Journey at Secretariat

From a collaborative culture to teammates who will always be by your side, find a career that will grow with you. Deliver your impact at Secretariat.

 

 

ABOUT THE FIRM

Secretariat professionals are trusted in the highest-stakes legal, risk, and regulatory matters around the world.

When you join Secretariat, you become part of a rapidly growing elite team of bright minds and passionate problem-solvers. Your skills and expertise will be utilized on day one – working with the world’s most renowned law firms, leading corporations, and influential institutions to answer complex questions that shape critical financial, economic, and strategic business decisions.

Our globally integrated teams are united by the ambition, energy, and commitment they bring to every challenge. We inspire and empower an open, collaborative culture that embraces ongoing professional development, recognition, diversity, and – most importantly – you.

Make your impact at Secretariat.

 

ABOUT OUR CONSTRUCTION DELAY TEAM

When it comes to understanding the details that have an impact on costly and disruptive construction delays, we have built a reputation that stands above all with decades of experience as engineers, project managers, architects, schedulers, and accountants. Our team is trusted for their sophisticated delay analysis involved in the biggest projects developed around the world, including notable buildings, infrastructure, power & utilities, and oil & gas works. That's why our team was honoured as Who's Who Legal's Construction Expert Witness Firm of the Year for 2023.

 

Responsibilities:

  • Research and fact-finding

    • Reviewing technical and non-technical documentation to identify key details and metrics used to develop expert reports. 

    • Through research, develop keen understanding of all relevant information pertaining to legal disputes regarding largescale construction projects

  • Detailed data analysis

    • Review large datasets using multiple analytical methods and tools to identify tends, anomalies, and other details which may have led to cost and schedule overruns

    • Independently draft sections of expert reports, expressing technical data in a clear and concise narrative

  • Quantification of delays and damages

    • Apply analytical methods to large datasets to calculate schedule delays and cost overruns in largescale construction projects

    • Draft expert reports, converting technical data into a narrative to be submitted to appropriate court venues

  • Economic modeling

    • Analyzing financial data and market data to determine lost profits due to schedule delays and cost overruns. 

  • Management

    • Manage facets of small to medium sized engagements, or components of large engagements, including staff supervision, client interaction and relationship building.

  • Business Development

    • Participate in new business pursuits

    • Assist in creation of proposals and client presentations

    • Assist in presenting to clients and prospective clients

  • Case Strategy

    • Assist executives in identifying the best approach to individual litigation/arbitration matters to assist clients in attaining a desired legal decision

 

 Requirements:

  • Bachelor’s degree in building construction, engineering, or related field

  • Qualification in construction law or law preferred

  • 10 or more years’ experience working in a relevant construction project management, scheduling, or cost controls capacity

  • Minimum of 3 years’ experience working at a dispute consulting firm leading on cases

  • Strong skills using relevant software tools: MS Office Suite (Word, Excel, PowerPoint, Access), MS Project, Primavera P3/P6, Suretrak

  • Familiar with delay analysis methodology including static delay analysis

  • Excellent written and verbal skills including experience drafting reports for litigation/arbitration (ability to write and conduct business in English)

  • Experience mentoring and developing junior level staff, and overseeing their work

  • Detail oriented with the ability to communicate highly technical material to non-technical audience

  • Ability to travel as needed (generally under 20% but may vary)

  • Strong interpersonal skills and ability to work as a member of a team

  • Flexible, creative problem-solving skills

  • Demonstrated excellent judgement and critical thinking abilities

  • Must be eligible to work in the US without the need for sponsorship in the future

 

A rewarding career above all

There are a lot of fine consulting firms out there. But when everything is on the line, it takes a unique combination of skill and savvy to succeed under pressure.

Our culture and people are driven by passion, pride, and performance. Passion for the clients we serve, the work we deliver, and the communities we live in. Pride in our cohesive team recognized for excellence and trusted to perform in the most challenging situations. And our track record of outstanding performance across all of our disciplines speaks for itself.

Our people are motivated to be the best in everything they do – from our approach to making the complex simple to the way we mentor our up-and-coming talent to become trusted experts early in their careers.

To learn how Secretariat collects, uses, and protects your personal information during the recruitment process, please review our Privacy Policy

 

Prêt à postuler chez Secretariat ?
Postuler chez Secretariat

Emplois similaires

Secretariat
Senior Associate, Damages & Valuations
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $100,000–$125,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 h
Secretariat
Associate, Engineering Sciences - Mechanical
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Secretariat
Operations Assistant
Secretariat
⚡ Postuler tôt München, Bavaria, Germany Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Secretariat
Consultant, Geology
Secretariat
⚡ Postuler tôt Boston, Massachusetts, United... Sur site $115,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Consultant, Geotechnical Engineering
Secretariat
⚡ Postuler tôt Atlanta, Georgia, United State... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Consultant, Geotechnical Engineering
Secretariat
⚡ Postuler tôt Atlanta, Georgia, United State... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Consultant, Engineering Sciences - Environmental Engineering
Secretariat
⚡ Postuler tôt Atlanta, Georgia, United State... · lieu restreint $115,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Consultant, Engineering Sciences - Electrical Engineering
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $135,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Secretariat
Consultant, Engineering Sciences - Batteries
Secretariat
⚡ Postuler tôt Chicago, Illinois, United Stat... Sur site $135,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Secretariat

Voir tous les emplois chez Secretariat →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit