Jobs › Companies › Vantage Data Centers › Senior Project Engineer, NA

À propos de ce poste Senior Project Engineer, NA chez Vantage Data Centers

Vantage Data Centers · Sur site · Shackelford County, Texas

About Vantage


Vantage powers, cools, protects and connects the technology of the world’s well-known hyperscalers, cloud providers and large enterprises. Developing and operating across North America, EMEA and Asia Pacific, Vantage has evolved data center design in innovative ways to deliver dramatic gains in reliability, efficiency and sustainability in flexible environments that can scale as quickly as the market demands.


Construction Delivery Department

The Project Delivery team is a key partner to Development, Engineering, Sales, Operations, Procurement, and other stakeholders throughout the project lifecycle, helping transform data center opportunities from concept and planning through design, procurement, construction, commissioning, customer delivery, and turnover to Operations. In partnership with Development & Engineering (D&E), the team is a key contributor to the development of project strategies, plans, and technical solutions, providing delivery expertise throughout planning, design, procurement, construction, and commissioning. Project Delivery leads project execution and is responsible for project performance, cost, and schedule from initial design through turnover to Operations. Many times, a role like this at other companies is purely oversight.


One thing that distinguishes Vantage is that our Project Delivery teams are given the responsibility and authority to directly drive the process. Compared to external resources, our internal team ensures key stakeholders are engaged in the decision-making process, aligning long-term operational sustainability with value engineering and cost objectives to deliver products that support corporate goals. This approach empowers each member of the team to drive high-impact decisions and even more impactful results.


Position Overview

The Senior Project Engineer of Construction can manage multiple project scopes within a project. The senior project engineer will also drive core project coordination across several teams throughout the construction process. Major focus for this role will include submittal/RFI workflow management, change order management, design coordination, project closeout management, payment application reviews, participation in commissioning, and coordination of construction activities with fill-time Operations staff. Regular collaboration are required with internal resources and design-build contractors.


Essential Job Functions

  • Demonstrate and promote the Vantage Values: Trust, Accountability, Respect and Agility
  • Lead and develop Vantage team members to include third-party project resources.
  • Lead project administration activities, including RFIs, submittals, and meeting documentation for assigned scopes, design and implementation.
  • Assist the construction team with project schedule and budget reporting, monthly forecasting, EAC reporting, and contractor billing support, including pay application review and coordination with project controls and CCF.
  • Lead procurement tracking, material timeline management, OFCI/CFCI coordination, and preconstruction/buyout activities for assigned projects.
  • Lead startup and commissioning activities, including team coordination, commissioning schedule management, CxAlloy administration, and readiness for customer milestones such as RNI, IST, and RFS.
  • Support the Vantage safety program through HRA site walks, safety reporting, and participation in project-wide safety reviews with internal and external stakeholders.
  • Manage design teams/contractors and support QA/QC of work products to ensure successful scope execution and compliance with applicable project design requirements.
  • Lead contract, PO, and billing administration by reviewing pay applications, tracking billing progress, coordinating with CCF, and identifying process improvement opportunities.
  • Facilitate page-turn design reviews and coordinate internal stakeholder involvement.
  • Collect and share ‘lessons learned’ in the feedback loop to drive continuous improvement
  • Perform other duties as assigned
  • Travel required is expected to be 10-30% but may increase over time as the business evolve

Job Requirements

  • Bachelor’s degree in construction management, or similar field, or equivalent experience
  • 3+ years of experience as a project engineer in assisting or supervising construction projects of  increasing complexity required; 5 years preferred.
  • Experience in CSA (civil, structural, architectural) and/or MEP (mechanical, electrical, plumbing) construction management is a requirement
  • Complex and technical construction experience is required
  • Data Center experience is preferred

Skills

  • Proficient in Microsoft Office suite (e.g., Excel, Word, PowerPoint, Outlook)
  • Working understanding of project scheduling concepts and tools (MS Project or P6)
  • Strong working knowledge of critical power and cooling infrastructure systems.
  • Proficiency in data center design and familiarity with North American construction markets preferred.
  • Familiarity with applicable building codes, fire ordinances, and regulatory requirements.
  • Strong organizational, analytical, and project management skills.
  • Excellent written and verbal communication skills with the ability to influence cross functional stakeholders.
  • Strong attention to detail, accuracy, and documentation standards.
  • Ability to multitask, prioritize, and operate effectively in a fast-paced environment.
  • Problem solving mindset with a focus on continuous improvement.
  • High level of integrity and professionalism.

Physical Demands and Special Requirements

The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

While performing the duties of this job, the employee is occasionally required to stand; walk; sit; use hands to handle, or feel objects; reach with hands and arms; climb stairs; balance; stoop or kneel; talk and hear. The employee must occasionally lift and/or move up to 25 pounds.


#LI-Onsite #LI-AT1


We operate with No Ego and No Arrogance. We work to build each other up and support one another, appreciating each other’s strengths and respecting each other’s weaknesses. We find joy in our work and each other, actively seeking opportunities to inject fun into what we do. Our hard and efficient work is rewarded with an above market total compensation package. We offer a comprehensive suite of health and welfare, retirement, and paid leave benefits exceeding local expectations.


Throughout the year, the advantage of being part of the Vantage team is evident with an array of benefits, recognition, training and development, and the knowledge that your contribution adds value to the company and our community.


Don't meet all the requirements? Please still apply if you think you are the right person for the position. We are always keen to speak to people who connect with our mission and values.


Vantage is an Equal Opportunity Employer.

Vantage does not accept unsolicited resumes from search firm agencies. Fees will not be paid in the event a candidate submitted by a recruiter without an agreement in place is hired; such resumes will be deemed the sole property of Vantage.


We’ll be accepting applications for at least one week from the date this role is posted. If you're interested, we encourage you to apply soon—we’re excited to find the right person and will keep the role open until we do!

Prêt à postuler chez Vantage Data Centers ?
Postuler chez Vantage Data Centers

Emplois similaires

Vantage Data Centers
Senior Change & Incident Analyst, Operations Service Management, APAC
Vantage Data Centers
⚡ Postuler tôt Sydney, Australia Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Vantage Data Centers
Lead Operations Budget Analyst, NA
Vantage Data Centers
⚡ Postuler tôt Denver, Colorado Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Vantage Data Centers
Connectivity Director, APAC
Vantage Data Centers
⚡ Postuler tôt Sydney, Australia Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Vantage Data Centers
Accountant (6 Months Contract)
Vantage Data Centers
⚡ Postuler tôt Cyberjaya, Malaysia Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Vantage Data Centers
Finance Paralegal (Capital Markets), NA
Vantage Data Centers
⚡ Postuler tôt Denver, Colorado Hybride $115,000–$130,000
● Nouveau 👁 Vu ✓ Postulé il y a 4 j
Vantage Data Centers
Senior Technical Project Manager, Automation Systems Delivery, NA
Vantage Data Centers
⚡ Postuler tôt Port Washington, Wisconsin Hybride
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Vantage Data Centers
Senior Accountant, APAC
Vantage Data Centers
⚡ Postuler tôt Cyberjaya, Malaysia Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Vantage Data Centers
Lead Accountant, APAC
Vantage Data Centers
⚡ Postuler tôt SIN11 Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 5 j
Vantage Data Centers
Senior Manager, Financial Reporting, NA
Vantage Data Centers
⚡ Postuler tôt Denver, Colorado Sur site $150,000–$190,000
● Nouveau 👁 Vu ✓ Postulé il y a 5 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Vantage Data Centers

Voir tous les emplois chez Vantage Data Centers →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit