Jobs › Companies › JRM Construction Management, LLC › Construction Scheduler

À propos de ce poste Construction Scheduler chez JRM Construction Management, LLC

JRM Construction Management, LLC · Sur site · Boca Raton, FL

Company Overview

At JRM Construction, we build more than exceptional spaces - we build talented teams, rewarding careers, and trusted relationships. As a leading employee-owned construction firm, our people take ownership of every project and work collaboratively to deliver outstanding quality and a positive client experience. Guided by integrity, teamwork, continuous improvement, and genuine care for our people, JRM provides an environment where employees can grow and help shape the company’s long-term success.

 

Job Summary

The Project Scheduler plays a vital role in a construction project, helping to manage both time and resources to ensure work is completed on time. Their primary responsibility is to keep existing project schedules accurate and up to date, assist the team in mitigating any schedule impacts, and provide all the schedule-based reports to the construction teams on a timely basis.

 

Responsibilities and Duties

  • Produce project schedule related reports for the project teams (schedule progress reports, Critical path, Overall Schedule, Near-Term, etc.).
  • Perform weekly schedule progress updates with construction teams.
  • Monitor schedule deviations and variances and assist project teams in developing recovery plans.
  • Maintain record of scope changes, trends and variances that potentially affect schedule performance.
  • Analyze critical and near-critical paths and communicate any deviations from baseline milestones and paths to the team.
  • Make recommendations to manage float and (re)sequence activities (if required) to achieve project milestone dates and interim target completion dates.
  • Verify schedule integrity and evaluate logic, constructability, and float paths.
  • Apply standardized work breakdown structures and milestones to develop project schedules collaboratively with the project team, enhancing overall project performance.
  • At the completion of the project, develop and record the project’s historical schedule information and lessons learned‚ for future use.
  • Support the Request for Proposal process by developing or reviewing project schedules for team presentation
  • Produce weekly and monthly Department reports summarizing the status of all current active projects
  • Assist with producing data analysis of all schedules including average slip based on standard milestones, lead times, and common delays.

 

Qualifications and Skills

  • A Bachelor’s degree in Scheduling, Engineering, Construction Management or a related field is a plus
  • At least 2 years of scheduling experience
  • Demonstrated understanding of the use of modern planning and scheduling principals, methodologies, techniques and tools
  • Excellent communication and organizational skills
  • Attention to detail and ability to work with large data volumes
  • Strong problem-solving skills and flexibility
  • Strong can-do attitude and flexibility to pivot in a fast-paced environment

 

Computer Systems

  • Proficient in Microsoft Office (Word, Excel, and PowerPoint)
  • Knowledge of scheduling software including Microsoft Project and/or Primavera P6

#LI-Hybrid

All qualified applicants will receive consideration for employment at JRM without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, veteran status, or other characteristics protected by law. 

 

The salary range listed in job postings reflects the Company’s good-faith estimate at the time of posting. Actual compensation may vary based on factors such as position tier, geographic location, work experience, market conditions, education/training, and skills.

 

For more information on how JRM Construction Management collects and uses your personal information, reference our Privacy Policy.

Prêt à postuler chez JRM Construction Management, LLC ?
Postuler chez JRM Construction Management, LLC

Emplois similaires

JC
Pursuit Manager
JRM Construction Management, LLC
⚡ Postuler tôt New York, NY Sur site $120,000–$160,000
● Nouveau 👁 Vu ✓ Postulé il y a 9 h
JC
Field Operations Coordinator
JRM Construction Management, LLC
⚡ Postuler tôt Costa Mesa, CA Sur site $75,000–$90,000
● Nouveau 👁 Vu ✓ Postulé il y a 17 h
JC
Traveling Superintendent
JRM Construction Management, LLC
⚡ Postuler tôt New York, NY Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
JC
Construction Management Intern - Summer 2027
JRM Construction Management, LLC
⚡ Postuler tôt Boca Raton, FL Sur site $45,760–$45,760
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
JC
General Superintendent
JRM Construction Management, LLC
⚡ Postuler tôt Los Angeles, CA Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
JC
Project Manager
JRM Construction Management, LLC
⚡ Postuler tôt Los Angeles, CA Sur site $120,000–$180,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
JC
Assistant Project Manager (Public)
JRM Construction Management, LLC
⚡ Postuler tôt New York, NY Sur site $100,000–$125,000
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
JC
Cybersecurity Analyst
JRM Construction Management, LLC
⚡ Postuler tôt New York, NY Sur site $100,000–$115,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.
JC
Assistant Project Manager
JRM Construction Management, LLC
⚡ Postuler tôt Boca Raton, FL Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez JRM Construction Management, LLC

Voir tous les emplois chez JRM Construction Management, LLC →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit