Jobs › Companies › Tutor Perini › Change Order Engineer

À propos de ce poste Change Order Engineer chez Tutor Perini

Tutor Perini · Sur site · New York, NY

The expected salary range for this position is $150,000 - $180,000 depending on experience

 

***NO STAFFING AGENCY CANDIDATES WILL BE CONSIDERED FOR THIS POSITION***

 

***Applicants must be eligible to work in the United States without visa sponsorship now or in the future***

Tutor Perini Corporation is seeking a Change Order Engineer to join our project site in midtown Manhattan.

About Tutor Perini Corporation

Extraordinary Projects, Exceptional Performance

The world relies on infrastructure — to ensure public safety, maintain a quality of life and support a healthy economy. For more than a century, Tutor Perini Corporation’s family of civil construction companies has supported the development and maintenance of infrastructure across our great nation.

We construct and rehabilitate highways, bridges, tunnels, mass-transit systems, and water management and wastewater treatment facilities. In short, we help our clients make “public works” work. Our corporate integrity, financial strength and outstanding record of performance makes us an at

tractive partner on large, sophisticated infrastructure projects.

From coast to coast, notable projects include The Purple Line (D Line) Extensions in Los Angeles, SR 99 Viaduct replacement tunnel in Seattle, East Side Access projects and the Hudson Yards Platform in New York, Central Subway Third Street Light Rail in San Francisco, and multiple airport expansions and bridge projects. At Tutor Perini Civil you will have the opportunity to work on a variety of large, high-profile, projects that impact your community.

Extraordinary Projects need Exceptional Talent

The Change Order Engineer is responsible for managing, evaluating, pricing, and negotiating change orders for civil/building construction projects. This role ensures that all scope changes, contract modifications, and cost impacts are properly documented, analyzed, and processed in accordance with contract requirements. The ideal candidate has extensive experience in heavy civil and vertical construction, strong knowledge of contract administration, and the ability to collaborate with project teams, clients, and subcontractors to protect the company’s financial and contractual interests.

Job Description:

Change Management & Cost Control

  • Lead the full lifecycle of change orders including identification, documentation, pricing, submission, negotiation, and execution

  • Analyze drawings, specifications, RFIs, field directives, and design revisions to determine scope impacts

  • Prepare detailed cost estimates for change orders including labor, materials, equipment, subcontractor costs, and schedule impacts

  • Track and maintain change order logs and ensure accurate cost forecasting and budget alignment

  • Evaluate subcontractor change order requests for validity, accuracy, and contractual compliance

Contract Administration

  • Interpret prime contracts, subcontracts, and project specifications to ensure changes comply with contractual terms

  • Prepare and review notices of change, claims, and supporting documentation in accordance with contract requirements

  • Ensure timely submission of change order proposals and supporting backup documentation

  • Assist in dispute resolution and claims mitigation related to scope changes

Coordination & Collaboration

  • Work closely with Project Managers, Superintendents, Estimators, and Field Engineers to capture and validate change events

  • Coordinate with clients, consultants, and design teams to clarify scope changes and secure approvals

  • Support procurement and subcontract teams with change order negotiations and cost justifications

  • Attend project meetings to identify potential changes and provide commercial input

Documentation & Reporting

  • Maintain organized records of all change events, cost breakdowns, and approvals

  • Prepare executive summaries and reports on change order status, trends, and financial impacts

  • Support monthly cost reports, forecasts, and project financial reviews

  • Ensure audit-ready documentation for all change-related transactions

Risk Management

  • Identify potential cost and schedule risks related to design changes and unforeseen conditions

  • Provide recommendations to minimize financial exposure and protect project margins

  • Assist in the development of mitigation strategies for disputed changes and claims

Required Skills:

  • Bachelor’s degree in Civil Engineering, Construction Management, or related field (required)

  • 10+ years of experience in change order management, cost engineering, or contract administration for a civil and building general contractor

  • Strong experience with heavy civil, infrastructure, and vertical construction projects (e.g., transportation, commercial, public works)

  • In-depth knowledge of construction contracts (lump sum, GMP, unit price, design-build)

  • Proven ability to price and negotiate complex change orders on large-scale projects

  • Strong understanding of project controls, scheduling impacts, and cost analysis

  • Proficiency in construction management and cost control software (e.g., Procore, Primavera P6, CMiC, or similar)

  • Advanced skills in Microsoft Excel and cost estimating tools

  • Ability to read and interpret construction drawings, specifications, and contracts

  • Excellent written and verbal skills

Equal Opportunity Employer

Prêt à postuler chez Tutor Perini ?
Postuler chez Tutor Perini

À propos de Tutor Perini

Click Here for more information

Voir tous les emplois chez Tutor Perini →

Emplois similaires

TP
Project Manager
Tutor Perini
⚡ Postuler tôt Houston, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Assistant Project Manager
Tutor Perini
⚡ Postuler tôt Houston, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Estimator - Heavy Civil, Roads & Bridges
Tutor Perini
⚡ Postuler tôt Rosemount, MN Sur site $75,000–$125,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Building General Superintendent
Tutor Perini
⚡ Postuler tôt New York, NY Sur site $300,000–$350,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Sr. Project Manager
Tutor Perini
⚡ Postuler tôt New York, NY Sur site $225,000–$275,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Concrete Superintendent
Tutor Perini
⚡ Postuler tôt Newark Airport - Newark, NJ 6... Sur site $175,000–$250,000
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Project Engineer
Tutor Perini
⚡ Postuler tôt Houston, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Purchaser
Tutor Perini
⚡ Postuler tôt Black River Falls, WI Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
TP
Industrial Construction Project Manager
Tutor Perini
⚡ Postuler tôt Hilbert, WI Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 2 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Tutor Perini

Voir tous les emplois chez Tutor Perini →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit