Jobs › Companies › Tutor Perini › Change Order Engineer

À propos de ce poste Change Order Engineer chez Tutor Perini

Tutor Perini · Sur site · Los Angeles, CA

Expected salary range for this position is $85,000 - $120,000 depending on experience.


Applicants must be eligible to work in the United States without visa sponsorship now or in the future.


All staffing agency inquiries must be directed exclusively to internal recruiter Matt Bachman at [email protected]. Direct contact from agencies to other employees is not permitted.

Tutor Perini Corporation is seeking a Construction Change Order Engineer for our project office in Los Angeles, CA.


About Tutor Perini Corporation


Tutor Perini Corporation is a leading civil, building, and specialty Construction Company that believes integrity, teamwork, and a collaborative approach are fundamental to our business success.


The world relies on infrastructure - to ensure public safety, maintain a quality of life and support a healthy economy. For more than a century, Tutor Perini Corporation’s family of construction companies has supported the development and maintenance of many diverse projects across our great nation.  Our corporate integrity, financial strength and outstanding record of performance makes us an attractive partner on large, sophisticated infrastructure projects.


From coast to coast, notable projects include The Purple Line (D Line) Extensions in Los Angeles, SR 99 Viaduct replacement tunnel in Seattle, East Side Access projects and the Hudson Yards Platform in New York, Central Subway Third Street Light Rail in San Francisco,

and multiple airport expansions and bridge projects. At Tutor Perini you will have the opportunity to work on a variety of large, high-profile projects that impact your community.


Extraordinary Projects need Exceptional Talent


DESCRIPTION:

As a Construction Change Order Engineer at Tutor Perini Corporation, you will have the opportunity to: 

  • Review Owner ordered extra work documents for accuracy and completeness and develop questions as they relate to assigned scope of work
  • Develop scope of work packages to define project work requirements through narratives, checklists, and quantity take-off for change order pricing
  • Solicit subcontractor/vendor quotations, prepare and distribute change order document packages, respond to inquiries, being knowledgeable of respective scopes of work and responsibilities
  • Evaluate and analyze subcontractor/vendor proposals to ensure accuracy in scope. (Quantities, schedule, inclusions, exclusions, etc.)
  • Prepare subcontractors/vendors price analysis sheets
  • Coordinate with operations team on this design-bid-build project to support development of cost and schedule proposals (CSP)
  • Finalize cost proposals for submission to the client
  • Assist with change order negotiations and finalize agreed upon terms, conditions, and price
  • Assist with purchasing and definition of subcontractor/ vendor agreements scope of work
  • Ability to work in a team environment with multiple Changes at the same time
  • Ability to understand construction documents and develop scopes of work
  • Good interpersonal and communication skills both written and oral
  • Working knowledge of Microsoft Office Suite (Excel and Word primarily)
  • Working knowledge of take-off software or similar a plus
  • Working knowledge of estimating software

REQUIREMENTS:

  • Five (5) or more years of relevant work experience
  • Two (2) or more years of experience in the construction industry with an emphasis on estimating
  • Experience in fixed price, design-build, and/ or self-perform estimating a plus
  • Experience with Government projects a plus
  • Experience with sitework, concrete, utilities, systems, or rail, a plus
  • Candidates local to downtown Los Angeles, California preferred

OUR MISSION

We build critical infrastructure that creates a better world.


OUR VISION

We strive to be the preeminent full-service civil, building, and specialty contractor by delivering innovative, transformative projects through world-class execution. We are committed to creating lasting value for our customers, upholding the highest standards of safety and integrity, generating exceptional financial results and shareholder value, and fostering a culture where our employees thrive.


Tutor Perini builds extraordinary projects, and we need exceptional talent.  Join us and together we will build the future.

Equal Opportunity Employer

Prêt à postuler chez Tutor Perini ?
Postuler chez Tutor Perini

À propos de Tutor Perini

Click Here for more information

Voir tous les emplois chez Tutor Perini →

Emplois similaires

TP
TBM Mechanical Superintendent
Tutor Perini
⚡ Postuler tôt White Plains, New York Sur site $199,000–$261,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Superintendent - Station Finishes
Tutor Perini
⚡ Postuler tôt Newark, NJ Sur site $175,000–$250,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Field Cost Engineer
Tutor Perini
⚡ Postuler tôt Los Angeles, CA Sur site $100,000–$140,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Project Manager - Railroad Division
Tutor Perini
⚡ Postuler tôt Milwaukee, WI Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Project Manager
Tutor Perini
⚡ Postuler tôt Hilbert, WI Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Field Engineer
Tutor Perini
⚡ Postuler tôt Los Angeles, CA Sur site $100,000–$120,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Director-Healthcare Construction
Tutor Perini
⚡ Postuler tôt Dallas, TX Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Junior Estimator - Heavy Civil Construction
Tutor Perini
⚡ Postuler tôt Sylmar, CA Sur site $75,000–$125,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
TP
Entry-Level Field Engineer - Heavy Civil Construction
Tutor Perini
⚡ Postuler tôt White Plains, New York Sur site $80,000–$110,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Tutor Perini

Voir tous les emplois chez Tutor Perini →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit