Jobs › Companies › CoreWeave › Senior Construction Manager - Data Center Construction

Sobre este puesto de Senior Construction Manager - Data Center Construction en CoreWeave

CoreWeave · Presencial · West Chicago, IL
CoreWeave is The Essential Cloud for AI™. Built for pioneers by pioneers, CoreWeave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, CoreWeave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, CoreWeave became a publicly traded company (Nasdaq: CRWV) in March 2025. Learn more at www.coreweave.com.

What You’ll Do:
You will be a key leader within CoreWeave’s Construction Services and Program Management team, driving the successful delivery of hyperscale data center construction projects across our global portfolio.


About the role:

As a Senior Data Center Construction Project Manager, you will serve as CoreWeave’s on-site owner’s representative, leading construction projects from pre-construction through close-out. You will oversee general contractors, manage contracts, and ensure projects are delivered in alignment with design specifications, budgets, master schedules, and committed Ready-for-Service (RFS) dates.

You will have a strong focus on the coordination and commissioning of MEP and low-voltage systems and will travel regularly to project sites to validate construction progress, verify work quality, and proactively identify and address schedule, cost, and delivery risks. You will drive projects toward successful completion while providing leadership with regular updates on progress, financials, risks, and overall project status.


Who You Are:

  • B.S. or B.A. degree in Construction, Architecture, Engineering, or a related field.
  • A minimum of 7 years of construction project management experience.
  • A minimum of 3 years of direct experience managing data center construction projects with a strong emphasis on MEP (Mechanical, Electrical, Plumbing) systems.
  • Demonstrated experience managing projects with a contract value of $100M+.
  • Deep understanding of data center infrastructure, including power distribution, cooling systems, and redundancy protocols.
  • Knowledge of construction components, processes, methodologies, and cost estimation.
  • Experience with web-based project management software.
  • A valid driver's license with no significant MVA points/violations.
  • Experience conducting on-site progress inspections and verifying contractor work against drawings, specifications, and the master schedule.

Preferred:

  • PMP (Project Management Professional) Certification
  • LEED AP (Leadership in Energy and Environmental Design Accredited Professional) Certification
  • Direct experience with electrical and low-voltage equipment coordination, commissioning, or quality assurance.

Wondering if you’re a good fit?

We believe in investing in our people, and value candidates who can bring their own diversified experiences to our teams – even if you aren't a 100% skill or experience match. Here are a few qualities we’ve found compatible with our team. If some of this describes you, we’d love to talk.

  • You love to take ownership and drive complex, technical projects from start to finish.
  • You’re curious about building the critical infrastructure that powers the future of computing.
  • You’re an expert in managing large-scale construction budgets, schedules, and contracts in mission-critical environments.

Why CoreWeave?

At CoreWeave, we work hard, have fun, and move fast!  We’re in an exciting stage of hyper-growth that you will not want to miss out on. We’re not afraid of a little chaos, and we’re constantly learning. Our team cares deeply about how we build our product and how we work together, which is represented through our core values: 

  • Be Curious at Your Core
  • Act Like an Owner
  • Empower Employees
  • Deliver Best-in-Class Client Experiences
  • Achieve More Together

We support and encourage an entrepreneurial outlook and independent thinking. We foster an environment that encourages collaboration and enables the development of innovative solutions to complex problems. As we get set for takeoff, the organization's growth opportunities are constantly expanding. You will be surrounded by some of the best talent in the industry, who will want to learn from you, too. Come join us!  

The base salary range for this role is $143,000 to  $210,000. The starting salary will be determined by job-related knowledge, skills, experience, and the market location. We strive for both market alignment and internal equity when determining compensation. In addition to base salary, our total rewards package includes a discretionary bonus, equity awards, and a comprehensive benefits program (all based on eligibility).

What We Offer

The range we’ve posted represents the typical compensation range for this role. To determine actual compensation, we review the market rate for each candidate which can include a variety of factors. These include qualifications, experience, interview performance, and location.

In addition to a competitive salary, we offer a variety of benefits to support your needs. The benefits below reflect our US-based offerings for full-time employees; for roles in other locations, benefits vary and are shared during the hiring process. These include:

  • Medical, dental, and vision insurance - 100% paid for by CoreWeave
  • Company-paid Life Insurance 
  • Voluntary supplemental life insurance 
  • Short and long-term disability insurance 
  • Flexible Spending Account
  • Health Savings Account
  • Tuition Reimbursement 
  • Ability to Participate in Employee Stock Purchase Program (ESPP)
  • Mental Wellness Benefits through Spring Health 
  • Family-Forming support provided by Carrot
  • Paid Parental Leave 
  • Flexible, full-service childcare support with Kinside
  • 401(k) with a generous employer match
  • Flexible PTO
  • Catered lunch each day in our office and data center locations
  • A casual work environment
  • A work culture focused on innovative disruption

California Applicants

California Consumer Privacy Act 

Equal Opportunity & Accommodations

CoreWeave is an equal opportunity employer, committed to fostering an inclusive and supportive workplace. All qualified applicants and candidates will receive consideration for employment without regard to race, color, religion, sex, disability, age, sexual orientation, gender identity, national origin, veteran status, or genetic information.

As part of this commitment and consistent with the Americans with Disabilities Act (ADA), CoreWeave will ensure that qualified applicants and candidates with disabilities are provided reasonable accommodations for the hiring process, unless such accommodation would cause an undue hardship. If reasonable accommodation is needed, please contact: careers@coreweave.com.

Export Control Compliance

This position requires access to export controlled information. To conform to U.S. Government export regulations applicable to that information, applicant must either be (A) a U.S. person, defined as a (i) U.S. citizen or national, (ii) U.S. lawful permanent resident (green card holder), (iii) refugee under 8 U.S.C. § 1157, or (iv) asylee under 8 U.S.C. § 1158, (B) eligible to access the export controlled information without a required export authorization, or (C) eligible and reasonably likely to obtain the required export authorization from the applicable U.S. government agency.  CoreWeave may, for legitimate business reasons, decline to pursue any export licensing process.

¿Listo para postularte en CoreWeave?
Postúlate en CoreWeave

Cómo se compara este salario de Construction Manager

Este puesto paga $176,500/yr — por encima de el rango típico para los puestos de Construction Manager.

$78,550 la mediana de $125,840 $187,550

Rango típico $102,986–$160,000/yr, a partir de 890 ofertas comparables de Construction Manager en JobsRadar (salario anualizado en USD). Ver datos salariales de Construction Manager →

Sobre CoreWeave

CoreWeave is a specialized cloud provider, delivering a massive scale of GPU compute resources on top of the industry’s fastest and most flexible infrastructure. CoreWeave builds cloud solutions for compute intensive use cases — VFX and rendering, machine learning and AI, batch processing, and Pixel Streaming — that are up to 35 times faster and 80% less expensive than the large, generalized public clouds. Learn more at www.coreweave.com.

Ver todos los empleos en CoreWeave →

Empleos similares

AB
Manager, Construction
Astound Broadband
⚡ Postúlate pronto IL-West Bradley,Chicago Presencial $100,000–$120,000
● Nuevo 👁 Visto ✓ Postulado hace 1d
Adobe
Site Operations Manager
Adobe
⚡ Postúlate pronto Munich Presencial
● Nuevo 👁 Visto ✓ Postulado hace 8m
Fidelity Investments
Product Manager, Portfolio Construction Solutions
Fidelity Investments
⚡ Postúlate pronto Merrimack, NH Presencial
● Nuevo 👁 Visto ✓ Postulado hace 30m
Redwood Materials
Senior Construction Project Manager
Redwood Materials
⚡ Postúlate pronto McCarran, NV Presencial
● Nuevo 👁 Visto ✓ Postulado hace 43m
Fifth Third Bank
Construction Project Manager
Fifth Third Bank
⚡ Postúlate pronto Cincinnati, OH Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1h
Redwood Materials
Staff Global Supply Manager, Construction
Redwood Materials
⚡ Postúlate pronto San Francisco, California, Uni... Híbrido $186,000–$215,000
● Nuevo 👁 Visto ✓ Postulado hace 1h
Erickson Senior Living
Construction Development Manager
Erickson Senior Living
⚡ Postúlate pronto Baltimore, MD Presencial $140,000–$160,000
● Nuevo 👁 Visto ✓ Postulado hace 1h
Consertus
Mid-Level Aviation Construction Manager
Consertus
⚡ Postúlate pronto US-WA-Seattle Presencial $105,000–$135,000
● Nuevo 👁 Visto ✓ Postulado hace 1h
IT
Segment Manager – Construction, Fabrication & Shipbuilding
ITW
⚡ Postúlate pronto Appleton-822 Comm Presencial $97,500–$162,500
● Nuevo 👁 Visto ✓ Postulado hace 1h

Regístrate para recibir sugerencias adaptadas a los empleos que abres y las búsquedas que guardas.

Más empleos en CoreWeave

Ver todos los empleos en CoreWeave →

Postúlate ahora
🤖

Un momento — para

JobsRadar se creó para personas reales que están pasando un mal momento en su búsqueda de empleo — no para solicitudes automatizadas. Estás haciendo clic demasiado rápido y ahora estás bloqueado temporalmente.

Vuelve más tarde. Si de verdad estás buscando empleo, cuentas con nosotros — solo compórtate como una persona.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Toma ventaja en tu búsqueda de empleo.

Únete a nuestro canal de Telegram para lo que te ayuda a conseguir el puesto — referencias salariales, el pulso semanal del mercado y avisos de nuevas funciones. Sin spam, solo señal.

Únete al canal — es gratis