Jobs › Companies › Rolls-Royce SMR › Project Manager - Long Lead Items (LLI)

Sobre este puesto de Project Manager - Long Lead Items (LLI) en Rolls-Royce SMR

Rolls-Royce SMR · Presencial · Derby, UK

Project Manager - Long Lead Items (LLI)

Location: Derby, Manchester or Warrington

Salary Range - £50,600 - £66,500


At Rolls-Royce SMR, we're delivering a British solution to a global energy challenge. Our Small Modular Reactor programme is helping shape the future of low-carbon energy and creating one of the UK's most exciting advanced engineering projects. As we move towards deployment, we're strengthening the teams that will deliver critical programme milestones and transform ambitious plans into reality.


The Programme Management team sits at the centre of this mission, bringing together engineering, procurement, regulation and construction disciplines to deliver complex programmes safely, efficiently and on schedule. Working across a broad stakeholder landscape, you'll help ensure critical project outcomes are achieved while influencing the future of nuclear deployment in the UK.


In this context, we're looking for a Project Manager - Long Lead Items (LLI) to support delivery of key equipment packages for the GBE-N programme. Reporting to the Programme Manager and leading a small team of Assistant Project Managers, you'll take ownership of critical projects that directly support the construction schedule and long-term success of a first-of-a-kind nuclear programme.


We'll need you to:

  • Lead the delivery of Long Lead Item projects from engineering specification through procurement, manufacture, site delivery and handover.
  • Coordinate engineering, procurement, construction and regulatory stakeholders to maintain programme momentum and manage critical interfaces.
  • Drive robust project controls, including schedule management, risk mitigation, forecasting and performance reporting.
  • Develop and mentor Assistant Project Managers while fostering a collaborative, high-performing team environment.  

This is a pivotal role within a high-profile programme, and you'll bring strategic thinking, strong stakeholder management skills and a proactive approach to solving complex delivery challenges, as well as:


What we're looking for

  • An engineering qualification, project management qualification (such as APM PMQ) or equivalent demonstrable experience managing complex engineering projects.
  • Experience leading major engineering or capital projects within highly regulated industries.
  • We'll ask about your experience coordinating multiple stakeholders, managing project risks and delivering projects to time, cost and quality requirements.
  • Knowledge of project management disciplines, contract management and project controls, with familiarity of tools such as Primavera P6, Microsoft Project, SAP, Power BI or similar platforms.

Location

We offer flexible and hybrid working, with regular attendance expected at one of our Rolls-Royce SMR locations. Travel to supplier, customer and project locations will be required as needed.


What's in it for you?

 The salary for this role is £50,600 - £66,500, dependent on the skills, experience and values you bring.  You’ll also receive: 

  • Bonus: 12.5% (performance related) 
  • Personal Benefits Allowance: £2,200 
  • Pension: 12% employer / 6% employee 
  • Holidays: 28 days + public holidays (option to buy/sell up to 4 days) 
  • Private Medical Insurance: BUPA 
  • Life Assurance: 6× pensionable pay 
  • Home Office Support: £250 one off payment for new starters 

Pay Range:

£50,600.00

-

£66,465.00

Why Join Us?


You’ll be joining a forward-thinking organisation that values transparency, fairness, and innovation. We offer:


•    A flexible, inclusive, and supportive working environment.
•    Opportunities for career growth in a rapidly scaling business.
•    A culture that values diversity, innovation, and continuous learning.


We are an equal opportunities employer and welcome applications from all backgrounds. Inclusivity is important to us, and as a Disability Confident organisation, we are committed to fair, supportive, and continually improving recruitment practices that ensure everyone has the opportunity to thrive.


Confidence can sometimes hold us back from applying for a job. But we'll let you in on a secret: there's no such thing as a 'perfect' candidate. If you feel you meet 75% of the requirements for this role, we would love to hear from you.


Also, if you are considering a career move or a sector-jump, please get in touch – we welcome applications from people with transferable skills.

Our Application Process


Due to the safety regulations within the nuclear industry, applicants will be required to participate in additional screening. These are:


•    Obtaining Baseline Personnel Security Standard (BPSS) clearance
•    Satisfactory completion of a Disclosure and Barring Service (DBS) check
•    Satisfactory completion of a basic financial probity check
 

#LI-CH1 #LI-Hybrid

¿Listo para postularte en Rolls-Royce SMR?
Postúlate en Rolls-Royce SMR

Cómo se compara este salario de Project Manager

Este puesto paga $77,536/yr — por debajo de el rango típico para los puestos de Project Manager.

$79,025 la mediana de $126,800 $177,500

Rango típico $102,773–$152,150/yr, a partir de 3,234 ofertas comparables de Project Manager en JobsRadar (salario anualizado en USD). Ver datos salariales de Project Manager →

Sobre Rolls-Royce SMR

We are Rolls-Royce SMR A career with Rolls-Royce SMR offers a unique opportunity to contribute to an exciting organisation delivering a transformational mission. Rolls-Royce SMR is a radically different approach to proven nuclear technology. Each Rolls-Royce SMR power station will generate 470MW of low-carbon energy - equivalent to more than 150 onshore wind turbines and enough to power a million homes for over 60 years. With its Rolls-Royce SMRs will play a vital role in supporting renewable energy by helping to overcome intermittency and ensure a stable, sustainable energy future. We’re proud to be one of the few employers that can genuinely say we’re a strengths-based organisation. Our pe

Ver todos los empleos en Rolls-Royce SMR →

Empleos similares

RR
Project Manager - Schedule and Estimates
Rolls-Royce SMR
⚡ Postúlate pronto Derby, UK Presencial £50,600–£66,465
● Nuevo 👁 Visto ✓ Postulado hace 1d
RR
Project Manager
Rolls-Royce SMR
⚡ Postúlate pronto Derby, UK Híbrido £50,600–£66,465
● Nuevo 👁 Visto ✓ Postulado hace 1d
Cambridge GaN Devices
R&D Project Manager
Cambridge GaN Devices
⚡ Postúlate pronto Cambridge, England, United Kin... Presencial
● Nuevo 👁 Visto ✓ Postulado hace 3h
ICS
Translation Project Manager (Russian-speaking)
ICS
⚡ Postúlate pronto Leeds, England, United Kingdom Presencial £25,000–£27,500
● Nuevo 👁 Visto ✓ Postulado hace 3h
Sona
Project Manager
Sona
⚡ Postúlate pronto London Presencial £70,000–£80,000
● Nuevo 👁 Visto ✓ Postulado hace 4h
Blue Cross Blue Shield of Massachusetts
Payment Integrity Project Manager
Blue Cross Blue Shield of Massachusetts
⚡ Postúlate pronto Boston Presencial $94,410–$115,390
● Nuevo 👁 Visto ✓ Postulado hace 4h
TE
Project Manager
TeamSystem
⚡ Postúlate pronto Italy, Milano Híbrido €41,000–€52,000
● Nuevo 👁 Visto ✓ Postulado hace 4h
Goodwin Procter
eDiscovery Project Manager (Relativity certification required)
Goodwin Procter
⚡ Postúlate pronto New York Presencial $145,000–$165,000
● Nuevo 👁 Visto ✓ Postulado hace 4h
FO
Project Manager I
Fortra
⚡ Postúlate pronto United States Presencial
● Nuevo 👁 Visto ✓ Postulado hace 4h

Regístrate para recibir sugerencias adaptadas a los empleos que abres y las búsquedas que guardas.

Más empleos en Rolls-Royce SMR

Ver todos los empleos en Rolls-Royce SMR →

Postúlate ahora
🤖

Un momento — para

JobsRadar se creó para personas reales que están pasando un mal momento en su búsqueda de empleo — no para solicitudes automatizadas. Estás haciendo clic demasiado rápido y ahora estás bloqueado temporalmente.

Vuelve más tarde. Si de verdad estás buscando empleo, cuentas con nosotros — solo compórtate como una persona.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Toma ventaja en tu búsqueda de empleo.

Únete a nuestro canal de Telegram para lo que te ayuda a conseguir el puesto — referencias salariales, el pulso semanal del mercado y avisos de nuevas funciones. Sin spam, solo señal.

Únete al canal — es gratis