Jobs › Companies › xAI › Construction Scheduler - Mobile Construction

Sobre este puesto de Construction Scheduler - Mobile Construction en xAI

xAI · Presencial · Southaven, MS; Memphis, TN

SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars.

SpaceXSI is building Super Intelligence to help humanity understand the universe. Our teams are building the full Super Intelligence stack: from our Colossus supercomputers, to Grok models, to our suite of applications, including Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X. We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.

CONSTRUCTION SCHEDULER

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

The team goes where the next site is — a pad, a factory, a supercluster, whatever has to exist before the rest of the company can move. Right now that is Memphis, TN / Southaven, MS. Then it is the next one. Per diem comes with the assignment.

RESPONSIBILITIES:

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model
  • Visit the site regularly. A scheduler who never walks the job will be wrong
  • Relocate with the mobile team as assignments change, starting in Memphis, TN / Southaven, MS

BASIC QUALIFICATIONS:

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor)
  • 4+ years of experience using Smartsheet, MS Project, or other project management tool
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)

PREFERRED SKILLS AND EXPERIENCE:

  • Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)
  • Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
  • Forensic delay analysis, time-impact analysis, and claims support
  • Cost/resource loading, earned value, and integration with cost systems
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud

ADDITIONAL REQUIREMENTS:

  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence
  • This role is part of the mobile construction team and you will be expected to travel to the assigned work project. Current work assignment is based in Memphis, TN / Southaven, MS. Future assignments will require relocation to other U.S. construction sites. Per diem is provided while on assignment
  • Must be comfortable working in a fully onsite environment
  • Must be willing to work any shift, extended hours and/or holidays during assigned work assignment. This includes rotating shifts, nights and/or weekends. If you are assigned night shift, you will receive a shift differential for hours worked during off nominal hours
  • Must be willing to work in industrial environments with exposure to noise, heavy equipment, excavations, and energized electrical systems. Must be able to lift 25 lbs+ unassisted and perform physically demanding tasks outdoors/indoors, tight conditions and/or at heights

SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

¿Listo para postularte en xAI?
Postúlate en xAI

Empleos similares

xAI
Cook
xAI
⚡ Postúlate pronto Palo Alto, CA Presencial $54,080–$58,240
● Nuevo 👁 Visto ✓ Postulado hace 7h
xAI
Operation & Maintenance Engineer (Power Plant) - Memphis
xAI
⚡ Postúlate pronto Southaven, MS; Memphis, TN Presencial
● Nuevo 👁 Visto ✓ Postulado hace 12h
xAI
Events Lead
xAI
⚡ Postúlate pronto New York, NY Presencial $125,000–$150,000
● Nuevo 👁 Visto ✓ Postulado hace 12h
xAI
Plumber (Service & Repair) - Memphis
xAI
⚡ Postúlate pronto Southaven, MS; Memphis, TN Presencial
● Nuevo 👁 Visto ✓ Postulado hace 13h
xAI
Events Lead
xAI
⚡ Postúlate pronto Los Angeles, CA Presencial $110,000–$135,000
● Nuevo 👁 Visto ✓ Postulado hace 13h
xAI
Manager, Supercomputer Site Reliability Engineering - Memphis
xAI
⚡ Postúlate pronto Southaven, MS; Memphis, TN Presencial
● Nuevo 👁 Visto ✓ Postulado hace 13h
xAI
Lead Critical Facilities Technician - Memphis
xAI
⚡ Postúlate pronto Southaven, MS; Memphis, TN Presencial
● Nuevo 👁 Visto ✓ Postulado hace 13h
xAI
Instrumentation & Controls Technician (Power Plant) - Memphis
xAI
⚡ Postúlate pronto Southaven, MS; Memphis, TN Presencial
● Nuevo 👁 Visto ✓ Postulado hace 13h
xAI
Sr. Commercial Counsel, Enterprise
xAI
⚡ Postúlate pronto Austin, TX; Los Angeles, CA; N... Presencial $200,000–$250,000
● Nuevo 👁 Visto ✓ Postulado hace 13h

Regístrate para recibir sugerencias adaptadas a los empleos que abres y las búsquedas que guardas.

Más empleos en xAI

Ver todos los empleos en xAI →

Postúlate ahora
🤖

Un momento — para

JobsRadar se creó para personas reales que están pasando un mal momento en su búsqueda de empleo — no para solicitudes automatizadas. Estás haciendo clic demasiado rápido y ahora estás bloqueado temporalmente.

Vuelve más tarde. Si de verdad estás buscando empleo, cuentas con nosotros — solo compórtate como una persona.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Toma ventaja en tu búsqueda de empleo.

Únete a nuestro canal de Telegram para lo que te ayuda a conseguir el puesto — referencias salariales, el pulso semanal del mercado y avisos de nuevas funciones. Sin spam, solo señal.

Únete al canal — es gratis