Jobs Companies KLA Engineering Change Order (ECO) Analyst (Enovia|PLM|ERP|MES|SAP)

Über diese Engineering Change Order (ECO) Analyst (Enovia|PLM|ERP|MES|SAP) Stelle bei KLA

KLA · Vor Ort · Milpitas, CA

Company Overview

KLA is a global leader in diversified electronics for the semiconductor manufacturing ecosystem. Virtually every electronic device in the world is produced using our technologies. No laptop, smartphone, wearable device, voice-controlled gadget, flexible screen, VR device or smart car would have made it into your hands without us. KLA invents systems and solutions for the manufacturing of wafers and reticles, integrated circuits, packaging, printed circuit boards and flat panel displays. The innovative ideas and devices that are advancing humanity all begin with inspiration, research and development. KLA focuses more than average on innovation and we invest 15% of sales back into R&D. Our expert teams of physicists, engineers, data scientists and problem-solvers work together with the world’s leading technology providers to accelerate the delivery of tomorrow’s electronic devices. Life here is exciting and our teams thrive on tackling really hard problems. There is never a dull moment with us.

Group/Division

With over 40 years of semiconductor process control experience, chipmakers around the globe rely on KLA to ensure that their fabs ramp next-generation devices to volume production quickly and cost-effectively. Enabling the movement towards advanced chip design, KLA's Global Products Group (GPG), which is responsible for creating all of KLA’s metrology and inspection products, is looking for the best and the brightest research scientist, software engineers, application development engineers, and senior product technology process engineers. The RAPID division is the world leading provider of reticle inspection solutions for the semiconductor industry. The company provides inspection solutions to both the mask shops and the semiconductor fabs to ensure that lithography yields are consistently high thus enabling cost-effective manufacturing.

Job Description/Preferred Qualifications

The role of an ECO Analyst is responsible for driving effective Engineering Change Order (ECO) execution across the organization while ensuring data integrity, procedural compliance, and efficient system integration. The position serves as a key change management partner, supporting accurate documentation, system alignment, and continuous improvement throughout the product lifecycle.

Job Description:

  • Ensure ECOs are audited for conformity to standard operation procedures and within the system rules of Enovia and SAP master data.

  • Advise on best practices for documenting changes on new and existing products.

  • Ensure data integrity between systems (PLM, ERP, MES, etc) throughout the change cycle.

  • Lead continuous improvement efforts of ECO and other related practices.

  • Analyze and track ECO submissions to minimize processing time between submission and implementation.

  • Analyze ECOs for system/business impacts, material dispositions, and optimal execution strategy.

  • Help with training ECO writers and approvers on Corporate ECO standard

  • Subject matter expert for ECO, PLM applications and processes.

Preferred Qualifications:

  • Thorough understanding of change management and configuration management practices and Configuration Control rules and their implementation.

  • Ability to operate efficiently and effectively in a fast-paced environment

  • Strong attention to details and uncompromising dedication to quality

  • Superior verbal and written communication skills

  • Exceptional organization skills

  • Demonstrated analytical abilities with strong attention to detail

  • Excellent follow-through

  • Must be driven and self-motivated as well as a team player

  • Microsoft Office suite expertise

  • PLM and ERP experience (Enovia and SAP Preferred)

  • Bachelor's Level Degree or work experience of 3-5 years

Minimum Qualifications

Doctorate (Academic) Degree and 0 years related work experience; Master's Level Degree and related work experience of 3 years; Bachelor's Level Degree and related work experience of 5 years

Base Pay Range: $83,000.00 - $141,100.00 Annually

Primary Location: USA-CA-Milpitas-KLA

KLA’s total rewards package for employees may also include participation in performance incentive programs and eligibility for additional benefits including but not limited to: medical, dental, vision, life, and other voluntary benefits, 401(K) including company matching, employee stock purchase program (ESPP), student debt assistance, tuition reimbursement program, development and career growth opportunities and programs, financial planning benefits, wellness benefits including an employee assistance program (EAP), paid time off and paid company holidays, and family care and bonding leave.

Interns are eligible for some of the benefits listed. Our pay ranges are determined by role, level, and location. The range displayed reflects the pay for this position in the primary location identified in this posting. Actual pay depends on several factors, including state minimum pay wage rates, location, job-related skills, experience, and relevant education level or training. We are committed to complying with all applicable federal and state minimum wage requirements where applicable. If applicable, your recruiter can share more about the specific pay range for your preferred location during the hiring process.

               

KLA is proud to be an Equal Opportunity Employer. We will ensure that qualified individuals with disabilities are provided reasonable accommodation to participate in the job application or interview process, to perform essential job functions, and to receive other benefits and privileges of employment. Please contact us at [email protected] or at +1-408-352-2808 to request accommodation.

Be aware of potentially fraudulent job postings or suspicious recruiting activity by persons that are currently posing as KLA employees.  KLA never asks for any financial compensation to be considered for an interview, to become an employee, or for equipment. Further, KLA does not work with any recruiters or third parties who charge such fees either directly or on behalf of KLA. Please ensure that you have searched KLA’s Careers website for legitimate job postings.  KLA follows a recruiting process that involves multiple interviews in person or on video conferencing with our hiring managers.  If you are concerned that a communication, an interview, an offer of employment, or that an employee is not legitimate, please send an email to [email protected] to confirm the person you are communicating with is an employee. We take your privacy very seriously and confidentially handle your information.

Bereit, sich bei KLA zu bewerben?
Bei KLA bewerben

Über KLA

Now hiring curious minds who want to learn even more. Explore KLA at www.kla.com/careers KLA is proud to be an Equal Opportunity Employer. We will ensure that qualified individuals with disabilities are provided reasonable accommodation to participate in the job application or interview process, to perform essential job functions, and to receive other benefits and privileges of employment. Please contact us at [email protected] or at +1-408-352-2808 to request accommodation. For additional information, view the US Know Your Rights poster on the U.S. Equal Employment Opportunity Commission website. We do not accept resumes from headhunters, placement agencies, or other suppliers that

Alle Jobs bei KLA ansehen →

Ähnliche Jobs

KLA
Workplace Operations Administrator
KLA
⚡ Früh bewerben Ann Arbor, MI Vor Ort $68,100–$99,900
● Neu 👁 Gesehen ✓ Beworben vor 17 Std.
KLA
Customer Success
KLA
⚡ Früh bewerben Migdal Ha'emek, Israel Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 17 Std.
KLA
Sr. Technology Enablement Engineer
KLA
⚡ Früh bewerben Ann Arbor, MI Vor Ort $129,600–$190,067
● Neu 👁 Gesehen ✓ Beworben vor 17 Std.
KLA
Product Marketing Manager
KLA
⚡ Früh bewerben Shanghai, China Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
KLA
Spares Demand Planning Supervisor
KLA
⚡ Früh bewerben USA-AZ-Phoenix-KLA Vor Ort $74,700–$109,567
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
KLA
Control Systems Engineer (PLC Specialist)
KLA
⚡ Früh bewerben Milpitas, CA Vor Ort $117,800–$172,800
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
KLA
Full-Stack Software Engineer
KLA
⚡ Früh bewerben Ann Arbor, MI Vor Ort $105,900–$155,300
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
KLA
Operations Executive Assistant - Student Role
KLA
⚡ Früh bewerben Migdal Ha'emek, Israel Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
KLA
Software Engineering Manager
KLA
⚡ Früh bewerben Ann Arbor, MI Vor Ort $153,300–$224,833
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei KLA

Alle Jobs bei KLA ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos