Jobs › Companies › Cumming Group › Senior Cost Manager (Data Center Construction)

Über diese Senior Cost Manager (Data Center Construction) Stelle bei Cumming Group

Cumming Group · Vor Ort · New York, NY

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



In this role, you will be a member of our highly reputable cost management and estimating team. The cost team delivers solutions to clients in the areas of conceptual estimating, budget development, cost planning, feasibility studies, value management, economic forecasting, milestone reports, pre- and post-contract auditing, change order review and reconciliation, BIM 5D cost modeling, LEED cost analysis, life cycle costing, and more. We encourage you to research us to learn more about our outstanding reputation within this service line.


We are currently hiring for a Senior Cost Manager in New York, NY. In this role, you will have the opportunity to work on data center and/or mission critical projects where you will be heavily involved in a variety of tasks ranging from estimating, cost controls, risk, and overall client management.


Essential Duties & Responsibilities:

  • Develop detail-level budgets, cost models, and order-of-magnitude estimates from limited design information, narratives, or schematic drawings during early pre-construction phases.
  • Project Assessment: Thoroughly evaluate project specifications, plans, and requirements to gain a comprehensive understanding of the project scope and objectives.
  • Material Takeoffs: Conduct detailed material takeoffs to quantify the required materials and resources for each project component accurately.
  • Cost Estimation: Utilize advanced construction estimating software and industry-standard methodologies to prepare precise cost estimates. This includes labor, materials, equipment, and contractor costs.
  • Cost Analysis: Analyze project costs, including direct and indirect expenses, overhead, and profit margins, to determine a competitive yet profitable bid price.
  • Competitive Analysis: Research and analyze competitors' bids and pricing strategies to develop competitive and profitable proposals.
  • Value Engineering: Collaborate with project teams to explore value engineering options and cost-saving alternatives without compromising project quality.
  • Estimate Review: Collaborate with estimating teams to review and refine estimates, ensuring accuracy, completeness, and adherence to company standards.
  • Bid Strategy: Develop and execute comprehensive bid strategies, considering factors such as project complexity, market conditions, and client expectations.
  • Bid Preparation: Lead the creation of thorough and organized bid packages, ensuring compliance with bid submission requirements, deadlines, and contractual obligations.
  • Client Interaction: Engage with clients and project stakeholders to clarify project specifications, answer inquiries, and build positive relationships.
  • Review, interpret and accurately estimate the scope of assigned work as described in the project documents. 
  • Develop and nurture sub-contractor, vendor, and client relationships. 
  • Lead client accounts. 
  • Review and comment on contracts and participate in contract negotiation. 
  • Prepare sub-contractor analysis sheets for assigned scope of work. 
  • Evaluate changes and subcontractor change order estimates and provide expertise in all phases of construction work. 
  • Perform Continuous Cost Management. 
  • Manage contract administration at the project level. 
  • Partner with management team in developing new customers and growing existing customer base. 
  • Develop and nurture client relationships to ensure client satisfaction. 
  • Support senior management by providing needed reports and responding to inquiries for information. 
  • Mentor associate level cost and commercial managers. 
  • Prepare project plans.
  • Other duties as assigned.
  • Attendance at work during normal business hours.

Knowledge & Skills Required:

  • Understand how your role contributes to the organization's goals. 
  • Deliver quality work product by role modeling organizational core values. 
  • Hold self accountable to individual and team goals. 
  • Consistently communicate and collaborate with team members and clients. 
  • Build relationships with peers, leaders, and clients. 
  • Proactively participate in self-development to continually enhance current skills and build new skills required to excel at current role and prepare for career progression. 
  • Provide pricing expertise in various phases of construction work. 
  • Partner with management team in developing new customers and growing existing customer base. 
  • Strong research skills and ability to allocate the relevant data. 
  • Exposure to industry events, functions, & creating a network of key AEC professionals in the market. 
  • Ability to effectively integrate with other departments. 
  • Ability to quickly analyze, compare, and interpret detailed but sometimes poorly defined information. 
  • Understand construction technology, economics of construction, construction delivery methodologies, local requirements on tax and insurances as they impact construction costs, ability to understand general conditions and general requirements at a detailed level.  
  • Understand construction law in the local market, applicable methods of measurement and approaches to parametric, top down and bottoms up estimates. 
  • Possess a working knowledge of the different roles and services Cumming provides and how the cost management team fits in the project. 
  • Ability to communicate with various stakeholders, internal and external to the company in a responsive manner. 
  • Ability to multi-task, prioritize, and work efficiently. 
  • Ability to perform at high levels in a fast paced, ever-changing work environment. 
  • Demonstrate consistent management of overall project assigned beyond tasks completion. 
  • Hold a professional qualification relative to your job role. 

Preferred Education and Experience:

  • Education: Bachelor's degree in Construction, Cost Management, Engineering, Quantity Surveying, or related field.
  • Minimum of 7 years' experience in Estimating, Cost Management or Quantity Surveying is required.
  • Preferred Certification: MRICS, AssocRICS, CCP, CEP, CPE or equivalent is preferred.
  • Experience working on data center and/or mission critical projects is required.
  • Proficient in CostX, OST and Microsoft Excel.

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $130,500.00-$174,033.36 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
  • Company-Paid Parental Leave
  • State Paid Family and Medical Leave (where applicable)
  • Lifestyle Spending Account (LSA)
  • Professional Development & Tuition Assistance



#LI-PJ1

  

Bereit, sich bei Cumming Group zu bewerben?
Bei Cumming Group bewerben

Über Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

Alle Jobs bei Cumming Group ansehen →

Ähnliche Jobs

Cumming Group
Site Logistic Project Manager - Data Center Construction
Cumming Group
⚡ Früh bewerben Vernon, TX Vor Ort $153,100–$214,367
● Neu 👁 Gesehen ✓ Beworben vor 2 Std.
Cumming Group
Assistant Project Manager
Cumming Group
⚡ Früh bewerben San Jose, CA Vor Ort $84,900–$113,233
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Program Manager
Cumming Group
⚡ Früh bewerben San Jose, CA Vor Ort $150,400–$210,533
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Cost Manager
Cumming Group
⚡ Früh bewerben New York, NY Vor Ort $91,700–$122,300
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Project Engineer (K-12)
Cumming Group
⚡ Früh bewerben Oakland, CA Vor Ort $91,700–$122,300
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Senior Project Manager
Cumming Group
⚡ Früh bewerben San Jose, CA Vor Ort $150,400–$210,533
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Senior Director - Data Center Construction
Cumming Group
⚡ Früh bewerben USA Client Site - Texas Vor Ort $153,100–$214,367
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Construction Project Director
Cumming Group
⚡ Früh bewerben Tampa, FL Vor Ort $153,100–$214,367
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Cumming Group
Project Manager
Cumming Group
⚡ Früh bewerben San Jose, CA Vor Ort $120,900–$161,233
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei Cumming Group

Alle Jobs bei Cumming Group ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos