Jobs Companies Amentum Pricing Analyst III - Change Order & Modifications

À propos de ce poste Pricing Analyst III - Change Order & Modifications chez Amentum

Amentum · Sur site · US-VA-Reston

Amentum is a global leader in advanced engineering and innovative technology solutions, trusted by the United States and its allies to address their most significant and complex challenges in science, security and sustainability. Headquartered in Virginia, we have more than 53,000 employees in approximately 80 countries across all 7 continents.


The Pricing Analyst III will be responsible for preparing cost and price proposals of medium to high complexity utilizing the principles of cost accounting standards and the Company’s Estimating System. This includes working closely with team members in an often-dynamic quick turn environment on solicitation requirements, pricing strategies, risk identification, and regulatory compliance of all proposals. The ideal candidate is highly inquisitive, demonstrates a strong financial acumen, meticulous attention to detail, and excels in building strong partnerships across the organization.


This is a remote position; a candidate local to an Amentum HQ facility (Chantilly, VA or Fort Worth, TX) or with the ability to travel is preferred.  US citizenship is required.


Principal Responsibilities:

  • Interfaces with Operations and Functional Support groups to obtain data necessary for developing prices or other components of a cost/price volume
  • Reviews data obtained and develops pricing models for medium to complex change order or modification proposals with minimal supervision
  • Develops and implements proposal strategies for achieving company objectives
  • Capable of developing robust and accurate cost models from the ground up as well as skillfully adapting and refining existing templates to ensure desired outcomes.
  • Demonstrate a strong ability to thoroughly analyze and interpret Request for Proposals (RFPs), Performance Work Statements (PWSs), and Statements of Work (SOWs), ensuring that all cost models accurately reflect customer requirements, compliance criteria, and deliverables outlined in these documents
  • Ability to write a basic cost narrative in line with company pricing methodologies and Government Request for Proposal guidelines when required
  • Ensures compliance with the estimating system manual as well as other policies and procedures
  • Performs quality assurance reviews to ensure that cost/price volume components are accurate and responsive to solicitation requirements
  • Provides pricing guidance and support, as required, to field personnel performing pricing related activities
  • Provide training, guidance, and mentorship to junior pricing team members while fostering collaboration with senior-level pricing professionals to ensure best practices and optimal outcomes.

 

Knowledge, Skills, and Abilities:

  • Experience in developing Price Proposals that include Service Contract Act Wage Determinations, and Collective Bargaining Agreements associated with labor unions.
  • Proven ability to thrive in a fast-paced, high-volume proposal environment with quick turnaround requirements, while maintaining accuracy and attention to detail.
  • Demonstrated ability to work efficiently under conditions of multiple deadlines and changing priorities to produce a large volume of high-quality material with keen attention to detail.
  • Exceptional organizational skills with the ability to manage multiple tasks and priorities effectively, while producing polished and professional-quality work products.
  • Knowledge of Federal Acquisition regulations (FAR), Defense Federal Acquisition Regulation (DFAR), and Cost Accounting Standards (CAS)
  • Data-driven and continuous learning mindset — Candidates should demonstrate curiosity, adaptability, and the ability to learn new technologies quickly, including leveraging AI to automate repetitive tasks, synthesize information, improve communication, and accelerate problem solving while maintaining human judgment and accountability.
  • Ability to evaluate and apply emerging technologies — Candidates should be comfortable assessing new AI-enabled tools and processes, identifying practical use cases, validating outputs, understanding limitations/risk, and incorporating AI responsibly into day-to-day work.
  • Demonstrate an emerging fluency with AI and its integration into workflows — Candidates should have some experience using AI tools to enhance workflows, productivity, decision-making, customer experiences, business outcomes, or operational efficiency.
  • Advanced Excel experience and mathematical skills.
  • Must be able to effectively communicate with all levels of the organization. 
  • Must possess excellent analytical skills.
  • Must be able to work extended hours, often with short notice, to meet deadlines.

 

Education & Experience:

  • Bachelor’s degree in a related field and at least 5-years of proposal pricing experience. 
  • Additional education may be substituted for experience, or additional experience may be substituted for education (generally 2 years of experience equals 1 year of education).
  • US Citizenship is required to apply.

 

Travel

·       10%-15% Travel may be required

       

Compensation Details:

$106k - 120K

       

The compensation range or hourly rate listed for this position is provided as a good-faith estimate of what the company intends to offer for this role at the time this posting was issued. Actual compensation may vary based on factors such as job responsibilities, education, experience, skills, internal equity, market data, applicable collective bargaining agreements, and relevant laws.

 

Benefits Overview:

Our health and welfare benefits are designed to support you and your priorities. Offerings include:

  • Health, dental, and vision insurance

  • Paid time off and holidays

  • Retirement benefits (including 401(k) matching)

  • Educational reimbursement

  • Parental leave

  • Employee stock purchase plan

  • Tax-saving options

  • Disability and life insurance

  • Pet insurance

 

Note: Benefits may vary based on employment type, location, and applicable agreements. Positions governed by a Collective Bargaining Agreement (CBA), the McNamara-O'Hara Service Contract Act (SCA), or other employment contracts may include different provisions/benefits.

       

Original Posting:

08/06/2026 - Until Filled

Amentum anticipates this job requisition will remain open for at least three days, with a closing date no earlier than three days after the original posting. This timeline may change based on business needs.

       

Amentum is proud to be an Equal Opportunity Employer. Our hiring practices provide equal opportunity for employment without regard to race, sex, sexual orientation, pregnancy (including pregnancy, childbirth, breastfeeding, or medical conditions related to pregnancy, childbirth, or breastfeeding), age, ancestry, United States military or veteran status, color, religion, creed,  marital or domestic partner status, medical condition, genetic information, national origin, citizenship status, low-income status, or mental or physical disability so long as the essential functions of the job can be performed with or without reasonable accommodation, or any other protected category under federal, state, or local law. Learn more about your rights under Federal laws and supplemental language at Labor Laws Posters.

Prêt à postuler chez Amentum ?
Postuler chez Amentum

À propos de Amentum

Amentum has become aware of unauthorized individuals who are falsely using the Amentum name and /or logo in an attempt to solicit fees from potential job seekers. These deceptive and unauthorized individuals are soliciting money, promising placement in a position with Amentum. Please note any communication requesting any amount of money in exchange for employment with Amentum is fraudulent. These communications do not originate from Amentum and are not associated with the recruitment process. Amentum and its affiliates never charge candidates fees or payments of any kind in order to secure employment. As a precaution, we recommend you do not disclose personal or financial details to anyone a

Voir tous les emplois chez Amentum →

Emplois similaires

Amentum
Principal CS&A Engineer
Amentum
⚡ Postuler tôt OCONUS-UK-Whitehaven Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 22 min
Amentum
Maintenance Test Pilot (AH-64D/E) - Illesheim, Germany
Amentum
⚡ Postuler tôt Germany-Illesheim Sur site $91,208–$91,208
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Information Technology Engineer
Amentum
⚡ Postuler tôt US-GA-Forest Park Sur site $80,000–$115,000
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
QEHS Manager
Amentum
⚡ Postuler tôt OC-VEN-Caracas Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Master Electrician
Amentum
⚡ Postuler tôt OC-VEN-Caracas Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Maintenance Trade Helper
Amentum
⚡ Postuler tôt US-GA-Kings Bay Sur site $57,720–$57,720
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Custodian, CAA Supervisor
Amentum
⚡ Postuler tôt OC-VEN-Caracas Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Cost Engineer
Amentum
⚡ Postuler tôt OCONUS-UK-Warrington Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 14 h
Amentum
Range Systems Supervisor
Amentum
⚡ Postuler tôt US-CA-Vandenberg AFB Sur site $110,000–$130,000
● Nouveau 👁 Vu ✓ Postulé il y a 14 h

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Amentum

Voir tous les emplois chez Amentum →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit