Jobs Companies Valard Construction Field Safety Advisor (Data Center Construction)

À propos de ce poste Field Safety Advisor (Data Center Construction) chez Valard Construction

Valard Construction · Sur site · Port Hawkesbury, Nova Scotia, Canada

Our Data Center group is currently looking to add a Field Safety Advisor to the team, based in Port Hawkesbury, NS.

Reporting to the Regional Safety Lead, this position provides support to supervisors, foremen and workers in the field and leadership / coordination of the day-to-day safety requirements for the project.  This position plays an important role in ensuring that Valard’s safety culture has been established and adhered to in the field.

Please Note: this is a field-based position working a shift of 14 days on / 7 days off (no work on Sundays), with 10 hour days. We offer Fly In / Fly Out from any major airport.  LOA provided or we can provide partial LOA and accommodations if needed. 

Duties and Responsibilities

  • Be a visible presence and safety resource in the field to ensure a safe work environment for all Valard employees, contractors, and visitors as per the Site Safety Management Plan (SMP)
  • Communicate, coach and assist field staff to ensure that all safety expectations are met
  • Participate in, and assist the supervisors and foreman with, investigation of incidents to determine root cause, and corrective actions
  • Participate in regular meetings with project safety teams to review issues, trends and upcoming conditions or events to ensure safety obligations are carried out as per client agreement and communicated to the Project Manager and Supervisors
  • Review tailboards daily to ensure that hazards are addressed, and a mitigation process is in place; provide feedback to workers to assist them in being compliant
  • Perform observations, inspections, emergency preparedness drills, and review / communicate the findings via safety meetings and postings
  • Facilitate weekly safety meetings, capture minutes and prepare weekly / monthly safety reports
  • Provide support to the supervisors and foreman to ensure that JSAs are developed and reviewed with the crews and available at the work site
  • Apply and reinforce the requirements of Valard's Health, Safety and Environmental Manual across all field activities
  • Regularly review and be familiar with all applicable legislation, and applicable standards and inform Project Manager(s) of any relevant changes

Requirements

  • Post-Secondary education in a related field
  • 5 years of construction site safety experience
    • a combination of education and experience may be considered
  • National Construction Safety Officer (NCSO) or Canadian Registered Safety Technician (CRST) Certification
  • Proven experience dealing with client requirements and providing administrative assistance with matters relating to safety
  • Have and maintain a valid driver's license and provide a driver's abstract (a record) for review
  • Experience with Microsoft Office applications

Preferred Skills / Qualifications

  • Demonstrated experience supporting electrical or data center construction projects
  • CRSP (Canadian Registered Safety Professional) certification
  • Demonstrated familiarity with applicable provincial legislations
  • Root cause investigation experience

Benefits

This position offers an hourly rate of $40.00 - $50.00, depending on experience and qualifications.

We offer a comprehensive and competitive total rewards package that incorporates a complete range of employee benefits, including a 5% RRSP matching program, to ensure you have the tools necessary to manage, maintain, and improve your health and wellbeing. 

About our Business

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere.  We are also part of Quanta Services, the largest electrical power contractor in North America.

Valard Construction is an equal opportunity employer.

Learn more

Visit us at www.valard.com and connect with us on our social media channels for our latest news, employee stories, community activities, and other updates.

* Depending on qualifications, the successful candidate may be offered a position at a more appropriate level.

* Applicants must have legal authorization to work in Canada with no restrictions.

* Valard Construction is committed to providing employment opportunities to all qualified individuals, without regard to race, religion, age, sex, color, national origin, sexual orientation, gender identity, veteran status, or disability.  Accommodation for applicants with disabilities is available on request during the recruitment process.

* We do not use automated tools to screen applications.  All hiring decisions involve human review.  This job posting is for an existing vacancy.

Prêt à postuler chez Valard Construction ?
Postuler chez Valard Construction

À propos de Valard Construction

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere. We are also part of Quanta Services, the largest electrical power contractor in North America.

Voir tous les emplois chez Valard Construction →

Emplois similaires

Valard Construction
Project Coordinator (Data Center Construction)
Valard Construction
⚡ Postuler tôt Port Hawkesbury, Nova Scotia,... Sur site $80,000–$110,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Valard Construction
Site Superintendent (Data Center Construction)
Valard Construction
⚡ Postuler tôt Port Hawkesbury, Nova Scotia,... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Valard Construction
Material Logistics & Yard Coordinator
Valard Construction
⚡ Postuler tôt Port Hawkesbury, Nova Scotia,... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Valard Construction
Project Administrator
Valard Construction
⚡ Postuler tôt Port Hawkesbury, Nova Scotia,... Sur site $60,000–$80,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 j
Valard Construction
Project Coordinator Student (Co-op / Intern) - Fall 2026
Valard Construction
⚡ Postuler tôt Vaughan, Ontario, Canada Sur site $58,240–$58,240
● Nouveau 👁 Vu ✓ Postulé il y a 2 j
Valard Construction
Estimator (Substations)
Valard Construction
⚡ Postuler tôt Edmonton, Alberta, Canada Sur site $100,000–$130,000
● Nouveau 👁 Vu ✓ Postulé il y a 6 j
Valard Construction
Quality Procurement Specialist
Valard Construction
⚡ Postuler tôt Calgary, Alberta, Canada Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.
Valard Construction
Quality Coordinator (Transmission)
Valard Construction
⚡ Postuler tôt Calgary, Alberta, Canada Sur site $85,467–$85,467
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.
Valard Construction
Project Engineer (Data Center Construction)
Valard Construction
⚡ Postuler tôt Port Hawkesbury, Nova Scotia,... Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 1 sem.

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Valard Construction

Voir tous les emplois chez Valard Construction →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit