Jobs › Companies › The Tsui Group › Senior Regional Construction Scheduler

About this Senior Regional Construction Scheduler role at The Tsui Group

The Tsui Group · Onsite · Los Angeles, California, United States

The Tsui Group is seeking a candidate who is qualified and experienced in educational facility construction projects to serve as a Senior Regional Construction Scheduler for a large educational client within Los Angeles County with the below duties:

  • Reporting directly to the Sr Construction Manager for Scheduling and Estimating and provides updates and prepares reports for upper management in order to meet Key Performance Indicators.
  • Supervise Project Schedulers to ensure project timelines are met and interfaces with OARs, Senior Project Managers and other site staff and contractors related to the review of CPM schedules, preparation of project scope and budget.
  • Projects staffing needs and makes recommendations to executive staff to improve staff requirements.
  • Develops and maintains program schedules identifying relationships, logic, milestones, and constraints for construction projects of various types.
  • Independently interprets and reads detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develops a clear understanding of work scope.
  • Reviews Contractor’s Baseline schedule submissions and verifies that all work scope is identified properly and logically sequenced correctly; provides written detailed schedule review comments.
  • Performs QA/QC on contractor schedule submittals for conformance with contract terms; reviews critical path, cost loading, resource loading of man-hours, schedule content, recovery schedules, use of logic relationships and lags, constraints and milestones.
  • Performs schedule Time Impact Analysis for any change orders that affect the construction schedule; conducts schedule negotiations with the OAR and the contractor for any delay time settlements.
  • Reads drawings to determine if work is in or out of scope, and understands terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Performs Critical Path analysis and Earned Value analysis.
  • Walks the construction sites as needed and checks the contractor’s weekly/monthly schedule progress; provides reports to the project OAR and upper management.
  • Effectively communicates with the Contractor regarding all schedule/progress related matters and concerns in the weekly status meetings and all other schedule related meetings.
  • Performs Program Schedule QA/QC reviews on a regular basis.
  • Performs status updates for Program Schedules/Master Schedules on a bi-monthly basis.
  • Prepares reports as needed and directed by Management.

Requirements

Minimum Required Experience:

  • Minimum of 10 years of full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version and MS Office Suite

Minimum Required Education:

  • Graduation from a recognized college or university with a bachelor’s degree in Architecture, Engineering or Construction Management

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (2) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics

Benefits

  • Salary Range:$172,000-$177,000
  • Medical, Vision, & Dental – 100% covered for the employee*
  • Life and Disability Insurance
  • 10.5 days of Vacation pay (Accrued)
  • 6 days of Sick pay (Available Immediately)
  • 13 days of Holiday pay
  • 3% Employer Contribution 401k (After 1 year of service)
  • Monthly Stipend for Cell Phone
  • Laptop for work purposes
Ready to apply to The Tsui Group?
Apply to The Tsui Group

About The Tsui Group

Program / Project / Construction Management Firm Specializing in Program Delivery

See all jobs at The Tsui Group →

Similar jobs

The Tsui Group
IT Technical Support I
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $72,000–$77,000
● New 👁 Seen ✓ Applied 1w ago
The Tsui Group
Engineer IV (Electrical)
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $131,000–$136,000
● New 👁 Seen ✓ Applied 1w ago
The Tsui Group
Senior Landscape Architect
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $167,000–$172,000
● New 👁 Seen ✓ Applied 1w ago
The Tsui Group
Public Outreach Specialist I
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $110,000–$115,000
● New 👁 Seen ✓ Applied 1w ago
The Tsui Group
Project Engineer III - Sustainability
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $122,000–$127,000
● New 👁 Seen ✓ Applied 1w ago
The Tsui Group
Project Engineer III
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $122,000–$127,000
● New 👁 Seen ✓ Applied 2w ago
The Tsui Group
Junior Scheduler
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $116,000–$116,000
● New 👁 Seen ✓ Applied 3mos ago
The Tsui Group
Owner Authorized Representative II
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $180,000–$180,000
● New 👁 Seen ✓ Applied 3mos ago
The Tsui Group
Owner Authorized Representative I
The Tsui Group
⚡ Apply early Los Angeles, California, Unite... Onsite $167,000–$167,000
● New 👁 Seen ✓ Applied 3mos ago

Sign up for suggestions tailored to the jobs you open and the searches you save.

More jobs at The Tsui Group

See all jobs at The Tsui Group →

Apply now
🤖

Whoa — hold up

JobsRadar was built for real people having a rough time in their job search — not for automated requests. You're clicking way too fast and you're now temporarily blocked.

Come back later. If you're genuinely job hunting, we've got your back — just act like a human.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Get an edge on your job hunt.

Join our Telegram channel for the stuff that helps you land the role — salary benchmarks, the weekly market pulse, and new-feature drops. No spam, just signal.

Join the channel — it's free