Jobs › Companies › Cumming Group › Senior Project Manager - Data Center Construction

About this Senior Project Manager - Data Center Construction role at Cumming Group

Cumming Group · Onsite · USA Client Site - Alabama

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!




Position Summary:

The Senior Project Manager will support the data hall portion of a new-build data center projects at our Monroe and Mobile, AL locations. This role will lead customer-specific construction and fit-out activities, coordinating design, procurement, construction, commissioning, and turnover to ensure scope, schedule, budget, and operational readiness requirements are met. Come join our team!


Essential Duties & Responsibilities:

  • Lead customer-specific construction and fit-out scope within large-scale data center projects.
  • Coordinate customer requirements with design, engineering, construction, procurement, commissioning, and operations teams.
  • Manage scope, budget, schedule, procurement, risk, and change management through turnover.
  • Review customer requirements and impacts to architectural, structural, mechanical, electrical, controls, security, and life-safety systems.
  • Lead design coordination and technical reviews with customers, consultants, contractors, and internal teams.
  • Develop scopes of work, bid packages, cost estimates, and procurement plans.
  • Manage change orders, commercial impacts, and cost recovery related to customer-driven changes.
  • Track long-lead equipment and materials and drive procurement to protect project milestones.
  • Coordinate field execution with General Contractors, trade partners, vendors, commissioning teams, and customer representatives.
  • Monitor progress, critical-path activities, and project risks; drive mitigation and recovery plans as needed.
  • Serve as a primary customer interface throughout construction, commissioning, and turnover.
  • Lead punch list, closeout, documentation, and operational readiness activities.
  • Provide regular reporting on cost, schedule, procurement, risk, and key customer commitments.

Knowledge & Skills Required:

Experience managing data center, mission-critical, industrial, or other complex construction projects.

Strong understanding of data center design, construction, fit-out, commissioning, and turnover.

Experience managing projects from design through construction and operational handoff.

Working knowledge of mechanical, electrical, controls, security, and other critical systems.

Experience with budgets, cost estimates, contracts, change orders, procurement, and commercial negotiations.

Strong knowledge of construction sequencing, scheduling, long-lead procurement, and risk management.

Ability to manage contractors, consultants, vendors, and multidisciplinary project teams.

Strong customer-facing communication, leadership, negotiation, and problem-solving skills.

Ability to manage multiple priorities in a fast-paced construction environment.


Knowledge & Skills Required:

  • 6+ years of construction project management experience, including mission-critical or data center projects.
  • Proven experience managing projects through design, procurement, construction, commissioning, and closeout.
  • Knowledge of data center electrical, mechanical, and critical infrastructure systems.
  • Experience managing contractors, consultants, budgets, schedules, and stakeholder relationships.
  • Data center experience highly preferred.

Preferred Education and Experience:


Education: BS in Construction, Engineering, or related field

Experience: 8+ years experience in project management, preferably on data center builds.


#LI-VM1


Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

 

The salary range for this full-time role is $115,700.00-$161,966.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program


#LI-SJ2

  

Ready to apply to Cumming Group?
Apply to Cumming Group

How this Project Manager salary compares

This role pays $138,833/yr — in line with the typical range for Project Manager roles.

$101,750 median $138,833 $171,125

Typical range $131,102–$164,188/yr, from 16 comparable Project Manager listings on JobsRadar (pay annualized to USD). See Project Manager salary insights →

About Cumming Group

At Cumming Group, we are passionate about helping our clients execute large-scale, complex projects on-time and within budget. Our project and cost-management services are specifically tailored to each client’s needs and add meaningful value at every step of a project’s development. Drawing on deep expertise in the communities and sectors we serve, we anticipate and solve problems, deliver solutions, and drive results. Since opening our doors in 1996, Cumming Group has grown to 50+ offices globally, and is now home to more than 3,000+ team members – including many of the brightest minds in the industry. Learn more about what a great organization we are here . Cumming Group is committed to pr

See all jobs at Cumming Group →

Similar jobs

Cushman & Wakefield
Project Manager
Cushman & Wakefield
⚡ Apply early Client Site - USA - CA - San J... Onsite $123,250–$145,000
● New 👁 Seen ✓ Applied 2d ago
Cushman & Wakefield
Sr. Project Manager
Cushman & Wakefield
⚡ Apply early Client Site - USA - CA - San J... Onsite $136,000–$160,000
● New 👁 Seen ✓ Applied 1w ago
Cumming Group
Senior Project Manager - Plano, TX
Cumming Group
⚡ Apply early USA Client Site - Texas Onsite $115,700–$161,967
● New 👁 Seen ✓ Applied 1w ago
Cushman & Wakefield
Project Manager
Cushman & Wakefield
⚡ Apply early Client Site - USA - CO - Longm... Onsite $127,500–$150,000
● New 👁 Seen ✓ Applied 1w ago
Cumming Group
Project Manager - Data Center Construction
Cumming Group
⚡ Apply early USA Client Site - Missouri Onsite $104,600–$139,467
● New 👁 Seen ✓ Applied 1mo ago
Cumming Group
Project Manager - Data Center Construction
Cumming Group
⚡ Apply early USA Client Site - Texas Onsite $115,700–$161,967
● New 👁 Seen ✓ Applied 1mo ago
Warner Bros. Discovery
Project Manager, Global Experiences
Warner Bros. Discovery
⚡ Apply early CA Burbank Bldg. 700, Second C... Onsite $70,000–$130,000
● New 👁 Seen ✓ Applied 14m ago
DA
Project Manager - Data Centers - MEP/Controls/HVAC - Dallas, Fort Worth, and West Texas
Daikin Applied
⚡ Apply early Dallas, TX 75050 Hybrid
● New 👁 Seen ✓ Applied 38m ago
Chickasaw Nation Industries
Project Manager
Chickasaw Nation Industries
⚡ Apply early Huntsville, AL Onsite
● New 👁 Seen ✓ Applied 45m ago

Sign up for suggestions tailored to the jobs you open and the searches you save.

More jobs at Cumming Group

See all jobs at Cumming Group →

Apply now
🤖

Whoa — hold up

JobsRadar was built for real people having a rough time in their job search — not for automated requests. You're clicking way too fast and you're now temporarily blocked.

Come back later. If you're genuinely job hunting, we've got your back — just act like a human.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Get an edge on your job hunt.

Join our Telegram channel for the stuff that helps you land the role — salary benchmarks, the weekly market pulse, and new-feature drops. No spam, just signal.

Join the channel — it's free