Jobs › Companies › CoreWeave Europe › Data Centre Construction Project Manager

About this Data Centre Construction Project Manager role at CoreWeave Europe

CoreWeave Europe · Onsite · London, England / Falun, Sweden / Barcelona, Spain / Ovrebo, Norway
CoreWeave is The Essential Cloud for AI™. Built for pioneers by pioneers, CoreWeave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, CoreWeave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, CoreWeave became a publicly traded company (Nasdaq: CRWV) in March 2025. Learn more at www.coreweave.com.
 
We're proud to be a Living Wage accredited Employer.

 

What You'll Do

Our Data Centre Design and Construction team is responsible for leading the expansion of CoreWeave's global footprint, managing the full lifecycle of mission-critical facility builds from pre-construction planning through commissioning and turnover. This team ensures our data centres are delivered on time, within budget, and to the highest standards of quality, safety, and operational excellence to support our high-performance cloud infrastructure.

About the role

As the Data Center Construction Project Manager, you will serve as the primary owner's representative, leading the overall direction, completion, and financial outcomes of multiple data centre construction projects. In this full-time on-site role, you will administer contracts with developers and general contractors, maintaining rigorous oversight of drawings, specifications, change management, and statutory planning approvals. Your primary focus will involve supervising the installation, coordination, commissioning, and quality assurance of complex Mechanical, Electrical, and Plumbing (MEP) systems, power distribution, and cooling infrastructure. Additionally, you will drive project schedules, manage multi-million pound budgets, and partner cross-functionally with supply chain, design, and executive stakeholders to ensure seamless project turnover.

Who You Are

  • 3+ years of construction project management experience with direct leadership on data centre construction projects.
  • Strong technical expertise in mission-critical infrastructure, with an emphasis on MEP systems, power distribution, cooling, and redundancy protocols.
  • Demonstrated experience managing construction contracts, financial forecasting, budget development, change management, and cost estimation.
  • Proven track record of on-site project leadership, coordinating general contractors, subcontractors, statutory bodies, and vendors.
  • Strong knowledge of pre-construction services, risk management, scheduling tools, and web-based project management software.
  • Ability to work on-site full-time and possess a valid driver's licence.

Preferred:

  • Bachelor’s degree in Construction Management, Architecture, Engineering, or a related technical discipline.
  • Experience managing large-scale mission-critical infrastructure projects with contract values exceeding £80M ($100M+).
  • Recognized industry certifications, such as Project Management Professional (PMP) or LEED certification.

Wondering if you're a good fit?

We believe in investing in our people and value candidates who bring diversified experiences to our teams—even if you do not match 100% of the listed criteria.

  • You love to: Manage the full lifecycle of complex technical projects and drive on-site construction execution.
  • You're curious about: The intricacies of data centre infrastructure, next-generation MEP systems, and scaling critical facility operations.
  • You're an expert in: Construction contract management, financial forecasting, and managing general contractors.

Why CoreWeave?

At CoreWeave, we work hard, have fun, and move fast! We are in an exciting stage of hyper-growth that you will not want to miss out on. We are not afraid of a little chaos, and we are constantly learning. Our team cares deeply about how we build our product and how we work together, which is represented through our core values:

  • Be Curious at Your Core
  • Act Like an Owner
  • Empower Employees
  • Deliver Best-in-Class Client Experiences
  • Achieve More Together

We support and encourage an entrepreneurial outlook and independent thinking. We foster an environment that encourages collaboration and enables the development of innovative solutions to complex problems. As we get set for take-off, the organisation's growth opportunities are constantly expanding. You will be surrounded by some of the best talent in the industry, who will want to learn from you, too. Come join us!

The starting salary will be determined by job-related knowledge, skills, experience, and the market location. We strive for both market alignment and internal equity when determining compensation. In addition to base salary, our total rewards package includes a discretionary bonus, equity awards, and a comprehensive benefits program (all based on eligibility).

To fulfill our obligation to protect client data, successful applicants offered employment with CoreWeave will be required to complete a basic criminal record check, conducted in compliance with GDPR. Employment offers are conditional upon receiving satisfactory check results.

What We Offer

In addition to a competitive salary, we offer a variety of benefits to support your needs, including:

  • Family-level Medical Insurance
  • Family-level Dental Insurance 
  • Generous Pension Contribution 
  • Life Assurance at 4x Salary 
  • Critical Illness Cover 
  • Employee Assistance Programme 
  • Tuition Reimbursement
  • Work culture focused on innovative disruption

Benefits may vary by location. 

Equal Opportunity 

CoreWeave is an equal opportunity employer, committed to fostering an inclusive and supportive workplace. All qualified applicants and candidates will receive consideration for employment without regard to race, color, religion, sex, disability, age, sexual orientation, gender identity, national origin, veteran status, or genetic information.

Recruitment Agencies

CoreWeave does not accept speculative CVs. Any unsolicited CVs received will be treated as the property of CoreWeave and your Terms & Conditions associated with the use of CVs will be considered null and void.

Any unsolicited CVs sent by your company to us – that is to say, in any situation where we have not directly engaged your company in writing to supply candidates for a specific vacancy – will be considered by us to be a “free gift”, leaving us liable for no fees whatsoever should we choose to contact the candidate directly and engage the candidate’s services, and will in no way establish any prior claim by your company to representation of that candidate should the candidate’s details also be submitted by any other party.

Export Control Compliance

This position requires access to export controlled information.  To conform to U.S. Government export regulations applicable to that information, applicant must either be (A) a U.S. person, defined as a (i) U.S. citizen or national, (ii) U.S. lawful permanent resident (green card holder), (iii) refugee under 8 U.S.C. § 1157, or (iv) asylee under 8 U.S.C. § 1158, (B) eligible to access the export controlled information without a required export authorization, or (C) eligible and reasonably likely to obtain the required export authorization from the applicable U.S. government agency.  CoreWeave may, for legitimate business reasons, decline to pursue any export licensing process.

 

Updated privacy notice - UK and EU Job Applications 

When you apply to a job on this site, the personal data contained in your application will be collected by CoreWeave UK Ltd. (“Controller”), which is located at

Phosphor (6th Floor), 133 Park Street, London, SE1 9EA

and can be contacted by emailing [email protected]. Controller’s data protection officer can be contacted at [email protected]. Your personal data will be processed for the purposes of managing Controller’s recruitment related activities, which include setting up and conducting interviews and tests for applicants, evaluating and assessing the results thereto, and as is otherwise needed in the recruitment and hiring processes. Such processing is legally permissible under Art. 6(1)(f) of (i) Regulation (EU) 2016/679 (General Data Protection Regulation (“GDPR”) and (ii) the GDPR as it forms part of the laws of the UK (“UK GDPR”), as necessary for the purposes of the legitimate interests pursued by the Controller, which are the solicitation, evaluation, and selection of applicants for employment. Your personal data will be shared with Greenhouse Software, Inc., a cloud services provider located in the United States of America and engaged by Controller to help manage its recruitment and hiring process on Controller’s behalf. With respect to transfers originating from the UK or the European Economic Area ("EEA") to a country outside the UK or the EEA, we implement the appropriate transfer mechanism(s) and other appropriate solutions to address cross-border transfers as required by applicable law. You may request a copy of the suitable mechanisms we have in place by contacting us at [email protected]

Your personal data will be retained by Controller as long as Controller determines it is necessary to evaluate your application for employment. Where permitted by applicable law, we may also retain your personal data for a limited period after the recruitment process ends in order to consider you for future job opportunities, respond to legal claims, or comply with record-keeping obligations. Under the GDPR and the UK GDPR, you have the right to request access to your personal data, to request that your personal data be rectified or erased, and to request that processing of your personal data be restricted. You also have the right to data portability. In addition, you may lodge a complaint with the relevant supervisory authority: (i) A list of Europe’s data protection authorities can be found here; and (ii) for the UK, this is the Information Commissioner's Office. 

For additional information, please see our Privacy Policy.

Ready to apply to CoreWeave Europe?
Apply to CoreWeave Europe

About CoreWeave Europe

Fueled by CoreWeave’s remarkable growth over the last year and to keep up with the surging demand we're seeing from customers and in the market, CoreWeave is expanding its operations to Europe. We’ve built a reputation for delivering cutting-edge GPU infrastructure for leading AI companies, and are thrilled to continue this journey as a trusted partner to the AI community in Europe. If you thrive in fast-paced, high growth environments and want to play a key role in building and delivering the critical infrastructure required by AI, we’d love to hear from you. Learn more at www.coreweave.com.

See all jobs at CoreWeave Europe →

Similar jobs

Zeta
Manager Site Reliability Engineer
Zeta
⚡ Apply early Hyderabad Onsite
● New 👁 Seen ✓ Applied 5h ago
Blattner Company
Program Site Manager - Major Projects Group
Blattner Company
⚡ Apply early Remote/Traveling (For Corporat... · location restricted $152,527–$221,165
● New 👁 Seen ✓ Applied 6h ago
UL
Construction Manager
US LBM
⚡ Apply early Baltimore, MD Onsite $65,000–$75,000
● New 👁 Seen ✓ Applied 7h ago
Redwood Materials
EHS Manager - Construction
Redwood Materials
⚡ Apply early Carson City, NV Onsite
● New 👁 Seen ✓ Applied 7h ago
Redwood Materials
Construction Quality Assurance/Quality Control Manager, EPC
Redwood Materials
⚡ Apply early McCarran, NV Onsite
● New 👁 Seen ✓ Applied 7h ago
Summit Health/CityMD
Finance Manager - On Site Connecticut
Summit Health/CityMD
⚡ Apply early Rocky Hill, CT Onsite $75,000–$100,000
● New 👁 Seen ✓ Applied 7h ago
Doxel
Construction Client Manager, Virginia
Doxel
⚡ Apply early Arlington, VA · location restricted
● New 👁 Seen ✓ Applied 13h ago
General Matter
Construction Manager
General Matter
⚡ Apply early Richland, WA Onsite $155,000–$220,000
● New 👁 Seen ✓ Applied 14h ago
General Matter
Program Manager, New Site
General Matter
⚡ Apply early Los Angeles, CA Onsite $170,000–$200,000
● New 👁 Seen ✓ Applied 14h ago

Sign up for suggestions tailored to the jobs you open and the searches you save.

More jobs at CoreWeave Europe

See all jobs at CoreWeave Europe →

Apply now
🤖

Whoa — hold up

JobsRadar was built for real people having a rough time in their job search — not for automated requests. You're clicking way too fast and you're now temporarily blocked.

Come back later. If you're genuinely job hunting, we've got your back — just act like a human.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Get an edge on your job hunt.

Join our Telegram channel for the stuff that helps you land the role — salary benchmarks, the weekly market pulse, and new-feature drops. No spam, just signal.

Join the channel — it's free