Jobs Companies Faith Technologies Mechanical Project Manager Data Center Construction

Über diese Mechanical Project Manager Data Center Construction Stelle bei Faith Technologies

Faith Technologies · Vor Ort · AL - Montgomery

You’ve discovered something special. A company that cares. Cares about leading the way in construction, engineering, manufacturing and renewable energy. Cares about redefining how energy is designed, applied and consumed. Cares about thoughtfully growing to meet market demands. And ─ as “one of the Healthiest 100 Workplaces in America” ─ is focused on the mind/body/soul of team members through our Culture of Care.

The Mechanical Project Manager (PM - Mech) is responsible for the onsite planning, coordination, execution, and closeout of mechanical systems on large-scale data center construction projects. This role ensures delivery of mechanical scope (piping, cooling systems, ductwork and related infrastructure) safely, on schedule, within budget and in accordance with contract requirements and data center performance standards.

MINIMUM REQUIREMENTS
Education: Bachelor’s degree in Mechanical Engineering, Construction Management, or a related field (or equivalent experience).
Experience: 7–15+ years of experience managing mechanical scopes on large-scale construction projects. Proven experience with mission-critical or data center projects is strongly preferred. Possesses a strong understanding of HVAC systems, chilled water systems, and data center cooling strategies, along with demonstrated success managing subcontractors, project schedules, and budgets.

Travel: 35-50%

Work Schedule: This position works between the hours of 6 am and 6 pm, Monday through Friday.

KEY RESPONSIBILITIES

Project Leadership & Execution

  • Lead all aspects of mechanical scope, including pre-site mobilization, site mobilization, commissioning, and project turnover.
  • Coordinate with engineering, manufacturing, and construction teams to ensure seamless project execution
  • Manage project schedules, milestones, and deliverables to meet aggressive data center timelines
  • Ensure mechanical systems align with design intent, specifications and owner requirements

Cost & Contract Management

  • Develop and manage budgets, invoicing, forecasts and cost tracking for mechanical scope
  • Oversee subcontractor agreements, purchase orders and change management processes
  • Identify and mitigate cost risks; drive value engineering where appropriate

Coordination & Interface Management

  • Act as the primary point of contact for mechanical trades, vendors, and stakeholders
  • Coordinate with FTI electrical, controls and GC teams to manage system interfaces
  • Coordinate commissioning activities with our manufacturing teams as well as our on-site install teams to ensure all aspects of the commissioning process is documented and accounted for regarding the mechanical systems.
  • Support BIM/VDC coordination, clash resolution and design integration efforts

Field Oversight & Quality

  • Partner with superintendents to ensure mechanical installations meet quality and safety standards
  • Monitor field progress, productivity and manpower planning
  • Ensure compliance with all applicable codes, specifications and commissioning requirements
  • Support development of a site-specific mechanical quality plan that is in line with the owner’s specifications.

Schedule & Planning

  • Develop detailed manufacturing and execution plans to integrate mechanical scope into the master schedule
  • Proactively identify risks to schedule and implement recovery plans as needed
  • Review daily Takt progress, deviations and remediation plans
  • Assist with coordination and development of Commissioning and Startup activities and sequence requirements.
  • Lead weekly coordination meetings and progress reviews

Safety & Compliance

  • Promote and enforce a strong safety culture across all mechanical activities
  • Ensure compliance with company policies, site safety plans, and regulatory requirements
  • Support implementation of project-specific safety plans and procedures
  • Monitor field activities and report safety concerns

Client & Stakeholder Management

  • Serve as a key mechanical liaison with owners, general contractors, inspectors, and design teams
  • Provide regular updates on progress, risks, and performance metrics
  • Support commissioning, testing, and final system turnover to the client
  • Performs other related duties as required and assigned.

The job description and responsibilities described are intended to provide guidelines for job expectations and the employee's ability to perform the position described. It is not intended to be construed as an exhaustive list of all functions, responsibilities, skills, and abilities. Additional functions and requirements may be assigned by supervisors as deemed appropriate.

How Does FTI Give YOU the Chance to Thrive?

If you’re energized by new challenges, FTI provides you with many opportunities. Joining FTI opens doors to redefine what’s possible for your future.

Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development and continued education programs give you opportunities to position yourself for success.

FTI is a “merit to the core” organization. We recognize and reward top performers, offering competitive, merit-based compensation, career path development and a flexible and robust benefits package.

 

Benefits are the Game-Changer

We provide industry-leading benefits as an investment in the lives of team members and their families. You’re invited to review the full list of FTI benefits available to regular/full-time team members. Start here. Grow here. Succeed here. If you’re ready to learn more about your career with FTI, apply today!

Faith Technologies, Inc. is an Equal Opportunity Employer – veterans/disabled.

Employment is contingent upon successfully passing a background and drug test

Bereit, sich bei Faith Technologies zu bewerben?
Bei Faith Technologies bewerben

Über Faith Technologies

Faith Technologies Incorporated (FTI) is a dynamic organization comprised of construction, engineering, manufacturing and renewable energy experts. We create success for our partners and team members through innovation and expertise, rethinking how energy is designed, applied and consumed and providing solutions that go beyond the ideas of today. With expertise across all our brands – Faith Technologies®, EnTech Solutions™ and Excellerate® – we are one connected company, bringing our partners’ visions to life to ensure a sustainable future.

Alle Jobs bei Faith Technologies ansehen →

Ähnliche Jobs

Cardinal Health
Project Manager, Nuclear Contract Manufacturing
Cardinal Health
⚡ Früh bewerben US-Nationwide-FIELD Vor Ort $80,900–$103,950
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
Highmark Health
Manager Client Project Management
Highmark Health
⚡ Früh bewerben PA, Working at Home - Pennsylv... Vor Ort $118,400–$118,400
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
Hargrove Engineers + Constructors
Project Manager
Hargrove Engineers + Constructors
⚡ Früh bewerben Mobile, AL Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 4 Tg.
SE
Preconstruction Project Manager (Remote)
SOLV Energy
⚡ Früh bewerben Remote - CA · standortgebunden $110,448–$138,060
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
KBR
Sr. Project Manager - Engineering
KBR
⚡ Früh bewerben Al Khobar, Saudi Arabia Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
Regions
Corporate Real Estate Project Manager
Regions
⚡ Früh bewerben Hoover, AL - Riverchase North... Vor Ort $113,980–$113,980
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
Blue Origin
Technical Project Manager III - Lunar Permanence
Blue Origin
⚡ Früh bewerben Greater Seattle Area Vor Ort $130,706–$182,988
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
Hargrove Engineers + Constructors
Project Manager
Hargrove Engineers + Constructors
⚡ Früh bewerben Muscle Shoals, AL Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 5 Tg.
JLL
Project Manager, PDS Projects
JLL
⚡ Früh bewerben Al Khobar, SAU Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 6 Tg.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei Faith Technologies

Alle Jobs bei Faith Technologies ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos