Jobs Companies Valard Construction Data Center Construction Manager

À propos de ce poste Data Center Construction Manager chez Valard Construction

Valard Construction · Télétravail · Canada

Our Data Centers group is currently looking to add a Construction Manager to our new team, based on-site at various locations across Canada.

Reporting to the Director, Data Centers, we are seeking an experienced and technically versatile Construction Manager with knowledge of data center construction to oversee daily on-site construction activities across civil, electrical, mechanical, structural, and technology infrastructure scopes. This position serves as the primary point of contact for Site Supervisors, subcontractors, and the client, ensuring projects are delivered safely, on time, and within budget.

Please Note: This is a field and office-based position and must be able to accommodate multiple shift requirements based on project schedules.

Duties and Responsibilities

Project Execution & Management

  • Develop and maintain construction execution plans, organizing and controlling all aspects of on-site work including civil, electrical, mechanical, structural, and technology infrastructure scopes
  • Monitor construction progress and implement corrective actions; ensure all internal and external project processes are followed and projects are delivered on time, on budget, and safely
  • Coordinate manpower and subcontractor allocations across multiple projects; work with Fleet and Equipment teams to ensure appropriate resources are deployed effectively
  • Work with QA/QC Management teams to ensure adequate quality oversight including compliance with data center commissioning requirements
  • Lead daily planning sessions with on-site personnel and prepare progress reports for the Director outlining project performance against schedule, budget, safety, and quality metrics

Training, Personnel & Labour Relations

  • Support Human Resources in managing labour relations across both union and non-union workforces as applicable to project requirements
  • Lead training and development of field crews, supervisors, and foremen; support recruitment of field supervisory staff

Estimating & Business Development

  • Support the estimating and proposal process including reviewing estimate requirements, submittal packages, pricing, scheduling, and preparation of written deliverables
  • Manage existing client relationships and support the development of new customer relationships

Requirements

  • Post-Secondary education in Construction Management, Engineering, or a related field
    • an equivalent combination of relevant education and experience may be considered
  • 10 years of experience in the construction industry
  • Proven experience with data center construction, including medium voltage electrical distribution, UPS and standby generation systems, HVAC/cooling infrastructure, structured cabling, and BMS/DCIM systems
  • Demonstrated ability to manage large work groups of up to 100 people across multiple disciplines
  • Proficiency in Microsoft Office and other computer applications for reporting and communication
  • Valid driver's licence with an acceptable driving record

Preferred Skills / Qualifications

  • Journeyman Electrician designation or equivalent electrical/mechanical trade certification
  • Experience with critical facilities construction and commissioning in mission-critical environments
  • Professional designation (P.Eng., PMP, or SCMP) or working towards one

Benefits

We offer a comprehensive and competitive total rewards package that incorporates a complete range of employee benefits, including a 5% RRSP matching program, to ensure you have the tools necessary to manage, maintain, and improve your health and wellbeing. 

About our Business

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere.  We are also part of Quanta Services, the largest electrical power contractor in North America.

Valard Construction is an equal opportunity employer.

Learn more

Visit us at www.valard.com and connect with us on our social media channels for our latest news, employee stories, community activities, and other updates.

* Depending on qualifications, the successful candidate may be offered a position at a more appropriate level.

* Applicants must have legal authorization to work in Canada with no restrictions.

* Valard Construction is committed to providing employment opportunities to all qualified individuals, without regard to race, religion, age, sex, color, national origin, sexual orientation, gender identity, veteran status, or disability.  Accommodation for applicants with disabilities is available on request during the recruitment process.

* We do not use automated tools to screen applications.  All hiring decisions involve human review.  This job posting is for an existing vacancy.

Prêt à postuler chez Valard Construction ?
Postuler chez Valard Construction

À propos de Valard Construction

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere. We are also part of Quanta Services, the largest electrical power contractor in North America.

Voir tous les emplois chez Valard Construction →

Emplois similaires

Valard Construction
Project Manager (Substation Construction)
Valard Construction
⚡ Postuler tôt Calgary, Alberta, Canada Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 3 j
JOEY Restaurants
Project Manager - Construction
JOEY Restaurants
⚡ Postuler tôt Vancouver, British Columbia, C... Sur site $85,000–$115,000
● Nouveau 👁 Vu ✓ Postulé il y a 1 mois
Associa
On-Site Limited License Condominium Manager
Associa
⚡ Postuler tôt Stoney Creek, Ontario, Canada CA$50,000–CA$50,000
● Nouveau 👁 Vu ✓ Postulé il y a 3 mois
Associa
On-Site General Licensed Condominium Manager
Associa
⚡ Postuler tôt York, Ontario, Canada CA$80,000–CA$80,000
● Nouveau 👁 Vu ✓ Postulé il y a 3 mois
Redwood Materials
Senior Construction Program Manager, EHS
Redwood Materials
⚡ Postuler tôt Carson City, NV Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 8 h
Redwood Materials
Senior BESS Construction Manager, EPC
Redwood Materials
⚡ Postuler tôt McCarran, NV Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 10 h
Divergent
Indirect Category Manager (Construction, Facilities, & CapEx)
Divergent
⚡ Postuler tôt Torrance, California, United S... Sur site $104,040–$190,868
● Nouveau 👁 Vu ✓ Postulé il y a 10 h
Redwood Materials
Construction Quality Assurance/Quality Control Manager, EPC
Redwood Materials
⚡ Postuler tôt McCarran, NV Sur site
● Nouveau 👁 Vu ✓ Postulé il y a 11 h
IN
Senior Construction Project Manager
Industrious
⚡ Postuler tôt NYC - 12 E 49th St (Tower 49) Sur site $145,000–$170,000
● Nouveau 👁 Vu ✓ Postulé il y a 12 h

Inscrivez-vous pour des suggestions adaptées aux emplois que vous ouvrez et aux recherches que vous enregistrez.

Plus d’emplois chez Valard Construction

Voir tous les emplois chez Valard Construction →

Postuler maintenant
🤖

Doucement — un instant

JobsRadar a été conçu pour de vraies personnes qui traversent une période difficile dans leur recherche d’emploi — pas pour des requêtes automatisées. Vous cliquez beaucoup trop vite et vous êtes maintenant temporairement bloqué.

Revenez plus tard. Si vous cherchez réellement un emploi, nous sommes de votre côté — agissez simplement comme un être humain.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Prenez une longueur d’avance dans votre recherche d’emploi.

Rejoignez notre canal Telegram pour ce qui vous aide à décrocher le poste — références salariales, le pouls hebdomadaire du marché et les annonces de nouveautés. Pas de spam, que du signal.

Rejoindre le canal — c’est gratuit