Jobs Companies Decima International Long-Lead Equipment Procurement Manager, Mechanical - Corsicana, TX, or Sweetwater, TX

Sobre este puesto de Long-Lead Equipment Procurement Manager, Mechanical - Corsicana, TX, or Sweetwater, TX en Decima International

Decima International · Presencial · Corsicana, Texas, United States; Sweetwater, Texas, United States

Decima International is a professional services company, providing project management and controls services to clients in the United States and the Middle East. Our mission is to become the premier professional services provider across all industry sectors we are engaged in. To accomplish this, Decima International’s founders established a simple yet powerful formula:

Approach each client engagement as a partnership, create an environment that attracts the most talented professionals and allows them to flourish, and regulate growth to maintain excellence in our service standards.

We are seeking a Long-Lead Equipment Procurement Manager, Mechanical, to support hyperscale data center construction projects in a PMC / owner’s representative capacity.

This role will focus on procurement and delivery oversight for critical mechanical long-lead equipment, including chillers, cooling towers, CRAH/CRAC units, liquid cooling infrastructure, and related MEP equipment.

The successful candidate will actively manage vendors, monitor factory schedules, track submittal and shop drawing approvals, identify manufacturing delays, and support procurement decisions that protect project cost, schedule, quality, and delivery commitments.

RESPONSIBILITIES

  • Lead procurement oversight for mechanical long-lead equipment packages.
  • Track and flag design freeze dates required for each mechanical equipment package - coordinate between the design team and procurement timeline to ensure technical specifications are frozen in time for supplier RFQ release.
  • Track procurement status against project schedule requirements.
  • Monitor vendor progress against approved manufacturing schedules.
  • Review factory milestone schedules and supplier progress updates.
  • Track submittals, shop drawings, approvals, and manufacturing releases.
  • Identify approval delays affecting fabrication or delivery timelines.
  • Assess manufacturing impacts from delayed technical approvals.
  • Validate supplier updates against project delivery requirements.
  • Escalate procurement risks affecting cost, schedule, quality, or turnover.
  • Review scopes, proposals, exclusions, assumptions, and lead times.
  • Support bid evaluations, award recommendations, and procurement decisions.
  • Coordinate with owners, project teams, vendors, suppliers, and contractors.
  • Maintain procurement logs, delivery trackers, and risk registers.
  • Prepare procurement updates, lookaheads, and leadership reports.
  • Support Factory Acceptance Testing planning and issue resolution.
  • Resolve procurement issues impacting construction, commissioning, or turnover.
  • Support procurement closeout and vendor performance feedback.

QUALIFICATIONS

Required qualifications:

  • Bachelor’s degree in Engineering, Construction Management, Supply Chain, or related fields.
  • 7+ years of procurement experience on large capital construction programs.
  • Experience supporting hyperscale data center or mission-critical construction projects.
  • Experience in a PMC, owner’s representative, developer, or client-side delivery environment.
  • Experience in procuring chillers.
  • Experience in procuring cooling towers.
  • Experience procuring CRAH or CRAC units.
  • Experience procuring liquid cooling infrastructure.
  • Experience supporting owner-direct procurement or OFCI/OFOI mechanical equipment packages.
  • Understanding of mechanical equipment submittal approval cycles.
  • Understanding of mechanical shop drawing approval cycles.
  • Ability to assess how approval delays impact manufacturing schedules.
  • Experience with active vendor management.
  • Experience in monitoring factory schedules for long-lead equipment.
  • Experience communicating procurement risks to project stakeholders.
  • Strong documentation, reporting, coordination, and issue-resolution skills.

Preferred qualifications:

  • Experience with MEP procurement or mechanical equipment procurement.
  • Experience coordinating Factory Acceptance Testing for mechanical equipment.
  • Familiarity with expediting, logistics, and supplier performance reviews.
  • Experience with GMP, lump sum, design-build, CM-at-Risk, or MSA agreements.
  • Experience with Procore, Unifier, e-Builder, Kahua, Oracle, SAP, or Coupa.
  • Experience with Smartsheet, Power BI, Microsoft Project, or Microsoft 365.

POSITION DETAILS

  • Location (On-site):
    • Corsicana, Texas
    • Sweetwater, Texas
  • Position: Long-Lead Equipment Procurement Manager, Mechanical
  • Position Classification: Salary-based full-time hours
  • Current work permit required. This position does not offer sponsorship for employment (e.g., H-1B visa sponsorship or transfer not offered)

PRODUCTIVITY TOOLS

  • Microsoft Project
  • Microsoft Office
  • Microsoft 365

 

Decima International is an Equal Opportunity Employer that is committed to the safety and well-being of all. All qualified applicants will receive consideration for employment without regard to race, religion, creed, color, national origin, ancestry, sex (including pregnancy, childbirth, breastfeeding, or medical conditions related to pregnancy, childbirth, or breastfeeding), age, medical condition, marital or domestic partner status, sexual orientation, gender, gender identity, gender expression and transgender status, mental disability or physical disability, genetic information, military or veteran status, citizenship, low-income status or any other status or characteristic protected by applicable law.

¿Listo para postularte en Decima International?
Postúlate en Decima International

Sobre Decima International

BECOME A PART OF THE DECIMA TEAM

 

Ver todos los empleos en Decima International →

Empleos similares

Decima International
Senior Construction Procurement Manager/OFCI Lead (On-site) - Corsicana, TX, or Sweetwater, TX
Decima International
⚡ Postúlate pronto Corsicana, Texas, United State... Presencial
● Nuevo 👁 Visto ✓ Postulado hace 5d
Decima International
Technology Procurement Specialist (On-site) - Corsicana, TX, or Sweetwater, TX
Decima International
⚡ Postúlate pronto Corsicana, Texas, United State... Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1sem
Decima International
Procurement Operations Manager, Procurement/Expediting (On-site) - Corsicana, TX, or Sweetwater, TX
Decima International
⚡ Postúlate pronto Corsicana, Texas, United State... Presencial
● Nuevo 👁 Visto ✓ Postulado hace 1sem
Verisign
Technology Sourcing and Procurement Manager
Verisign
⚡ Postúlate pronto Reston,Virginia,United States Híbrido $123,500–$167,100
● Nuevo 👁 Visto ✓ Postulado hace 6h
Augury
Sourcing Manager, Contract Manufacturing
Augury
⚡ Postúlate pronto Taiwan Presencial
● Nuevo 👁 Visto ✓ Postulado hace 7h
Roblox
Strategic Sourcing Manager - Technology
Roblox
⚡ Postúlate pronto San Mateo, CA, United States Presencial $159,850–$193,930
● Nuevo 👁 Visto ✓ Postulado hace 7h
Toshiba Global Commerce Solutions - External
Procurement Specialist II
Toshiba Global Commerce Solutions - External
⚡ Postúlate pronto Durham, NC Presencial
● Nuevo 👁 Visto ✓ Postulado hace 7h
ABACUS
Procurement Triage Specialist
ABACUS
⚡ Postúlate pronto Remote in US · restringido por ubicación
● Nuevo 👁 Visto ✓ Postulado hace 7h
Take-Two Interactive Software, Inc.
Senior Manager, Strategic Sourcing - Corporate Services
Take-Two Interactive Software, Inc.
⚡ Postúlate pronto GBR-London-Cleveland Street Presencial
● Nuevo 👁 Visto ✓ Postulado hace 8h

Regístrate para recibir sugerencias adaptadas a los empleos que abres y las búsquedas que guardas.

Más empleos en Decima International

Ver todos los empleos en Decima International →

Postúlate ahora
🤖

Un momento — para

JobsRadar se creó para personas reales que están pasando un mal momento en su búsqueda de empleo — no para solicitudes automatizadas. Estás haciendo clic demasiado rápido y ahora estás bloqueado temporalmente.

Vuelve más tarde. Si de verdad estás buscando empleo, cuentas con nosotros — solo compórtate como una persona.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Toma ventaja en tu búsqueda de empleo.

Únete a nuestro canal de Telegram para lo que te ayuda a conseguir el puesto — referencias salariales, el pulso semanal del mercado y avisos de nuevas funciones. Sin spam, solo señal.

Únete al canal — es gratis