Jobs Companies Valard Construction Project Engineer (Data Center Construction)

Über diese Project Engineer (Data Center Construction) Stelle bei Valard Construction

Valard Construction · Vor Ort · Port Hawkesbury, Nova Scotia, Canada

Our Data Center group is growing, and we are currently looking to add a Project Engineer to the team, based in Port Hawkesbury, NS.

Reporting to the Director, Data Centers, this position will support the construction of a new Data Center and serve as the primary technical point of contact for clients as needed. Based on site, this position will offer construction support, generate non-compliance reports when necessary, and promptly address any inquiries from the construction team while ensuring the completion of project documentation. Additionally, the position will identify and suggest solutions for issues and meticulously reviewing specifications, drawings, and test reports to uphold high-quality design standards.

Please Note: this position will work on-site on a shift of 21 days days on / 7 days off, with 10 hours / day.

Duties and Responsibilities

  • Write and plan project scope, proposals, estimates, change notices, budgets and similar documents
  • Develop material and construction specifications
  • Prepare estimates, procurement support, material take-offs, requisitions, design packages and technical evaluations
  • Track reception of material and inventory
  • Maintain and enhance relationships with internal groups and clients.
  • Provide construction support, write non-compliances reports (when necessary), and responding to information requests from construction team and ensuring project documentation is completed
  • Find, recommend, and provide solutions to problems
  • Checking specifications, drawings and test reports to ensure high-quality design
  • Run the Quality Plan and ensure the validity of documents related to the quality and monitors them
  • Act as liaison and technical resources for all construction personnel on the project

Requirements

  • Post-Secondary degree in Engineering
  • 3 years of relevant project related engineering experience
  • Registered, or eligible to register, as an Engineer or Engineer In Training with a Provincial association
  • Have and maintain a class 5 driver’s license in good standing

Preferred Skills / Experience

  • Experience with Data Center construction projects
  • Experience with large electrical projects
  • Experience with JD Edwards (or similar ERP systems)

Benefits

We offer a comprehensive and competitive total rewards package that incorporates a complete range of employee benefits, including a 5% RRSP matching program, to ensure you have the tools necessary to manage, maintain, and improve your health and wellbeing. 

About our Business

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere.  We are also part of Quanta Services, the largest electrical power contractor in North America.

Valard Construction is an equal opportunity employer.

Learn more

Visit us at www.valard.com and connect with us on our social media channels for our latest news, employee stories, community activities, and other updates.

* Depending on qualifications, the successful candidate may be offered a position at a more appropriate level.

* Applicants must have legal authorization to work in Canada with no restrictions.

* Valard Construction is committed to providing employment opportunities to all qualified individuals, without regard to race, religion, age, sex, color, national origin, sexual orientation, gender identity, veteran status, or disability.  Accommodation for applicants with disabilities is available on request during the recruitment process.

* We do not use automated tools to screen applications.  All hiring decisions involve human review.  This job posting is for an existing vacancy.

Bereit, sich bei Valard Construction zu bewerben?
Bei Valard Construction bewerben

Über Valard Construction

Valard Construction is Canada’s premier utility contractor providing comprehensive EPC+ (engineering, procurement, construction) and maintenance services to utilities, independent power producers, mining, oil and gas industries and rural electric associations. We have the capabilities, knowledge, and resources to take on any project, any size, any complexity, anywhere. We are also part of Quanta Services, the largest electrical power contractor in North America.

Alle Jobs bei Valard Construction ansehen →

Ähnliche Jobs

Valard Construction
Project Administrator
Valard Construction
⚡ Früh bewerben Port Hawkesbury, Nova Scotia,... Vor Ort $60,000–$80,000
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Valard Construction
Project Coordinator (Data Center Construction)
Valard Construction
⚡ Früh bewerben Port Hawkesbury, Nova Scotia,... Vor Ort $80,000–$110,000
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Valard Construction
Material Logistics & Yard Coordinator
Valard Construction
⚡ Früh bewerben Port Hawkesbury, Nova Scotia,... Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Valard Construction
Site Superintendent (Data Center Construction)
Valard Construction
⚡ Früh bewerben Port Hawkesbury, Nova Scotia,... Vor Ort
● Neu 👁 Gesehen ✓ Beworben vor 1 Tg.
Valard Construction
Field Safety Advisor (Data Center Construction)
Valard Construction
⚡ Früh bewerben Port Hawkesbury, Nova Scotia,... Vor Ort $83,200–$104,000
● Neu 👁 Gesehen ✓ Beworben vor 2 Tg.
Valard Construction
Project Coordinator Student (Co-op / Intern) - Fall 2026
Valard Construction
⚡ Früh bewerben Vaughan, Ontario, Canada Vor Ort $58,240–$58,240
● Neu 👁 Gesehen ✓ Beworben vor 2 Tg.
Valard Construction
Estimator (Substations)
Valard Construction
⚡ Früh bewerben Edmonton, Alberta, Canada Vor Ort $100,000–$130,000
● Neu 👁 Gesehen ✓ Beworben vor 6 Tg.
Valard Construction
Quality Manager (Transmission)
Valard Construction
⚡ Früh bewerben Calgary, Alberta, Canada Vor Ort $108,160–$108,160
● Neu 👁 Gesehen ✓ Beworben vor 1 Wo.
Valard Construction
Quality Coordinator (Transmission)
Valard Construction
⚡ Früh bewerben Calgary, Alberta, Canada Vor Ort $85,467–$85,467
● Neu 👁 Gesehen ✓ Beworben vor 1 Wo.

Registrieren für Vorschläge, die auf die von Ihnen geöffneten Jobs und gespeicherten Suchen zugeschnitten sind.

Mehr Jobs bei Valard Construction

Alle Jobs bei Valard Construction ansehen →

Jetzt bewerben
🤖

Moment — langsam

JobsRadar wurde für echte Menschen gebaut, die eine schwere Zeit bei der Jobsuche haben — nicht für automatisierte Anfragen. Sie klicken viel zu schnell und sind jetzt vorübergehend blockiert.

Kommen Sie später wieder. Wenn Sie wirklich auf Jobsuche sind, stehen wir hinter Ihnen — verhalten Sie sich einfach wie ein Mensch.

Catch your next role the second it’s posted.

Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

Create free account

Free forever · takes 30 seconds · already have one?

Verschaffe dir einen Vorsprung bei der Jobsuche.

Tritt unserem Telegram-Kanal bei für das, was dir hilft, die Stelle zu bekommen — Gehaltsbenchmarks, den wöchentlichen Marktpuls und neue Feature-Drops. Kein Spam, nur Signal.

Dem Kanal beitreten — kostenlos