Jobs Companies Accenture GN I&E S&P Data Center Construction Manager

About this GN I&E S&P Data Center Construction Manager role at Accenture

Accenture · Onsite · Bengaluru

Data Center Construction Manager

Job Summary

We are seeking an experienced Data Center Construction Manager to oversee the end-to-end delivery of mission-critical data center projects. You will manage general contractors, MEP subcontractors, and commissioning agents to ensure facilities are delivered on schedule, within budget, and to specification. The ideal candidate combines deep technical expertise in critical facility systems with strong project leadership skills, enabling seamless handoff to operations teams.

Key Responsibilities

  • Lead day-to-day construction management of new data center builds and retrofits, including ground-up campuses, shell-and-core fit-outs, and critical infrastructure upgrades.
  • Manage RFP/RFQ processes, bid leveling, and contract award for general contractors and specialty subcontractors (structural, civil, electrical, mechanical, fire suppression, and low-voltage).
  • Coordinate with design teams (architects, structural/MEP engineers) to resolve field conflicts, issue RFIs, and manage design submittals and shop drawings.
  • Develop and maintain master project schedules (P6 or MS Project), tracking milestones for sitework, steel erection, MEP rough-in, commissioning, and IT readiness.
  • Oversee commissioning and integrated systems testing (IST) for power systems (UPS, generators, switchgear, PDUs), cooling infrastructure (CRAC/CRAH, chillers, cooling towers, liquid cooling), and life-safety systems.
  • Manage project budgets from $50M to $500M+, including monthly cost reporting, change order evaluation, and forecasting CapEx/OpEx through project closeout.
  • Enforce EHS compliance on site, conducting daily safety walks, toolbox talks, and incident investigations in alignment with OSHA standards and corporate safety programs.
  • Coordinate vendor qualification and equipment procurement for critical path items (transformers, generators, UPS systems, cooling equipment) to mitigate supply chain risks.
  • Serve as primary liaison between ownership, design consultants, contractors, and local authorities having jurisdiction (AHJ) for permitting, inspections, and Certificate of Occupancy.
  • Mentor and supervise construction coordinators, site engineers, and owner's representative staff embedded on project sites.

    Preferred Skills

    • Experience with hyperscale or colocation data center campuses exceeding 50MW critical IT load.
    • Knowledge of sustainable construction practices including LEED certification, water usage effectiveness (WUE), and energy modeling for PUE optimization.
    • Background in modular or prefabricated data center construction (e.g., skid-mounted power, containerized cooling).
    • Familiarity with liquid cooling infrastructure: direct liquid cooling (DLC), rear-door heat exchangers, and immersion cooling systems.
    • Experience with BIM coordination (Revit, Navisworks) for clash detection and construction sequencing.

    Qualifications

    • Bachelor's/Master’s degree in Construction Management, Civil Engineering, Mechanical Engineering, or related field; PMP or CCM certification preferred.
    • 7+ years of construction management experience, with at least 3 years on mission-critical or data center projects in a direct management capacity.
    • Demonstrated expertise in critical facility systems: medium-voltage switchgear, diesel generators, UPS systems, HVAC/chiller plants, and fire suppression.
    • Proficiency in project scheduling tools (Primavera P6, MS Project) and construction management platforms (Procore, e-Builder, or equivalent).
    • Strong command of commissioning processes including Level 1–5 testing, IST, and DCIM/BMS integration validation.
    • Familiarity with data center standards and guidelines: Uptime Institute Tier Classifications, TIA-942, ASHRAE TC 9.9, and NFPA 75/76.
    • Proven ability to manage multi-prime contract structures and navigate complex stakeholder environments across ownership, design, and contractor teams.
    • Willingness to travel to site visits, project kickoffs, and commissioning events.

    About Accenture

    Accenture is a leading global professional services company that helps the world’s leading businesses, governments and other organizations build their digital core, optimize their operations, accelerate revenue growth and enhance citizen services—creating tangible value at speed and scale. We are a talent- and innovation-led company with approximately 791,000 people serving clients in more than 120 countries. Technology is at the core of change today, and we are one of the world’s leaders in helping drive that change, with strong ecosystem relationships. We combine our strength in technology and leadership in cloud, data and AI with unmatched industry experience, functional expertise and global delivery capability. Our broad range of services, solutions and assets across Strategy & Consulting, Technology, Operations, Industry X and Song, together with our culture of shared success and commitment to creating 360° value, enable us to help our clients reinvent and build trusted, lasting relationships. We measure our success by the 360° value we create for our clients, each other, our shareholders, partners and communities.

    Visit us at www.accenture.com 

    Equal Employment Opportunity Statement


    We believe that no one should be discriminated against because of their differences. All employment decisions shall be made without regard to age, race, creed, color, religion, sex, national origin, ancestry, disability status, military veteran status, sexual orientation, gender identity or expression, genetic information, marital status, citizenship status or any other basis as protected by applicable law. Our rich diversity makes us more innovative, more competitive, and more creative, which helps us better serve our clients and our communities.

    Ready to apply to Accenture?
    Apply to Accenture

    About Accenture

    Bring your incredible skills and join our global team of innovators. We come together from different backgrounds across the world and work with the latest technologies to create value and growth for our clients. With us, you’ll continue to learn and grow so you can advance in your career. Your personal dreams and ambitions are just as important to us; that’s why we offer support any way we can—when you thrive, we all thrive. Explore your next step at Accenture

    See all jobs at Accenture →

    Similar jobs

    Okta
    Manager- Site Reliability Engineer
    Okta
    ⚡ Apply early Bengaluru, India Onsite
    ● New 👁 Seen ✓ Applied 5d ago
    Okta
    Manager- Site Reliability Engineering
    Okta
    ⚡ Apply early Bengaluru, India Onsite
    ● New 👁 Seen ✓ Applied 1w ago
    Cushman & Wakefield
    Project Manager/Assistant Project Manager/Project Engineer - Civil/Construction (Commercial/Industrial/Residential/Hospitality/Mixed Use)
    Cushman & Wakefield
    ⚡ Apply early Bengaluru, India Onsite
    ● New 👁 Seen ✓ Applied 3w ago
    Autodesk
    Technical Success Manager, Construction
    Autodesk
    ⚡ Apply early APAC - India - Bengaluru - Sun... Onsite
    ● New 👁 Seen ✓ Applied 3w ago
    Two95 International Inc.
    Senior Project Management cum Construction Manager- 14 years
    Two95 International Inc.
    ⚡ Apply early Bengaluru, Karnataka, India Onsite
    ● New 👁 Seen ✓ Applied 2mos ago
    M/I Homes
    Residential Construction Service Manager
    M/I Homes
    ⚡ Apply early Cincinnati, Ohio, United State... Onsite
    ● New 👁 Seen ✓ Applied 8h ago
    M/I Homes
    Construction Manager - Northern Houston
    M/I Homes
    ⚡ Apply early Houston, Texas, United States Onsite
    ● New 👁 Seen ✓ Applied 8h ago
    M/I Homes
    Construction Manager
    M/I Homes
    ⚡ Apply early Orlando, Florida, United State... Onsite
    ● New 👁 Seen ✓ Applied 8h ago
    Redwood Materials
    Senior Construction Program Manager, EHS
    Redwood Materials
    ⚡ Apply early Carson City, NV Onsite
    ● New 👁 Seen ✓ Applied 9h ago

    Sign up for suggestions tailored to the jobs you open and the searches you save.

    More jobs at Accenture

    See all jobs at Accenture →

    Apply now
    🤖

    Whoa — hold up

    JobsRadar was built for real people having a rough time in their job search — not for automated requests. You're clicking way too fast and you're now temporarily blocked.

    Come back later. If you're genuinely job hunting, we've got your back — just act like a human.

    Catch your next role the second it’s posted.

    Create a free account and we’ll watch the boards for you — the instant a job matches your search, it lands in your inbox or Telegram. No digging, no refreshing.

    Create free account

    Free forever · takes 30 seconds · already have one?

    Get an edge on your job hunt.

    Join our Telegram channel for the stuff that helps you land the role — salary benchmarks, the weekly market pulse, and new-feature drops. No spam, just signal.

    Join the channel — it's free